Similar Projects
Replacement of roof system and siding at Animal Shelter
Renovation
Sub-Bidding
$500,000 CJ est. value
Mexico, MO 65265

PW Storage Roof Replacement
Renovation
Sub-Bidding
$700,000 CJ est. value
Olivette, MO 63132

Roof Top Unit Replacements
Renovation, Alteration
Post-Bid
Liberty, MO

SL District St. Charles Maintenance Building Reroof
Infrastructure
Post-Bid
Saint Charles, MO 63303

Replace 5 Existing Skylights with High Impact Polycarbonate Skylights and Curbing
Alteration
Results
Coffman, MO 63670

Roof Repairs and Waterproofing
Alteration
Results
Affton, Hanley Hills, MO 63123

Division of Youth Services Improvements - Roof Replacements
Renovation
Construction
$115,429 CJ est. value
Cape Girardeau, MO 63701

Cape Girardeau Airport Roof Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Cape Girardeau, MO 63701

SL District O'Fallon Construction Office Roofing
Alteration
Post-Bid
Cottleville, MO 63304

Roof Replacement
Alteration
Results
Tipton, MO

Roof Repair - Street Division
Renovation
Sub-Bidding
$130,000 CJ est. value
Cottleville, MO 63366

Fort Leonard Wood Roofing IDIQ
Alteration
Post-Bid
Fort Leonard Wood, MO

Roof Replacement - Kansas City DOLIR Building
Alteration
Results
Kansas City, MO 64102

Roof Replacement Valle Ambulance District House 2
Renovation
Sub-Bidding
$300,000 CJ est. value
Desoto, MO 63020

Maintenance Building Roof Restoration
Infrastructure
Post-Bid
Festus, MO

Last Updated 07/18/2023 02:08 PM
Project Title

Roof Repairs Liberty High School & Manor Hill Elementary 2023 Summer Project

Physical Address View project details and contacts
City, State (County) Liberty, MO 64068   (Clay County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $279,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

NOTICE OF ACCEPTANCE OF BIDS Notice is hereby given that the Liberty Public School District No. 53 will receive bid proposals for the following: ROOF REPAIRS The District reserves the right to reject any or all bids and waive any informality. All questions, requests for information or clarification pertaining to this bid must be submitted in writing to Jason Breit at jasonbreit@lps53.org Friday, July 14, 2023 Question Deadline - 11:00 AM CST The Work consists of the following: 1. General Conditions and Details for all roof areas: a. The Contractor shall be responsible to coordinate daily activities with the owner to help minimum noise, smell, and cleanliness disruptions. 1) Contractors shall provide a schedule of activities, drawing of setup and work areas with their submittals, and updates for weekly progress meetings. 2) Contractor shall notify the owner during check-in if they will be using an open flame or have flammable materials requiring a Burn Permit. If so, the owner shall issue a Burn Permit to the foreman during check-in. b. Contractor shall keep complete roofing specification and approved submittal drawing on the roof always during the work. c. It is the responsibility of the contractor to report in writing to the Owner, any areas of cracks or deterioration to the masonry walls above the roofline. d. It is the responsibility of the contractor to examine the job site and document any damages or issues with pictures and/or video. Any damages found after start of work will be the responsibility of the contractor. e. It is the responsibility of the contractor to clean roofs, drains, gutters, and scuppers of all debris and trash at the end of the project. 2. Liberty High School - Roof 15 a. On Roof 15, the district will have the loose gravel vacuumed from the roof around all four (4) wet areas prior to August 1, 2023. 1) Remove and reinstall lightning protection as needed to complete roofing repairs. 2) There are four (4) wet areas along the southeast area as shown on the attached Roof Diagnostic Survey. a) The wet areas shown at the southwest perimeter and by the solar panels are not included in this work. 3) Spud and remove all gravel over and around the four wet areas, 115' x 35', from the roof membrane by hand. a) All removed gravel shall be evenly dispersed onto existing roof outside area where loose gravel was vacuumed off the roof. 4) Clean roof membrane of all dirt, dust, and debris and then prime the roof membrane with TremPrime QD. 5) Adhere 1-ply Burmastic Composite Ply HT and 1-ply of PowerPly Plus HT FR with PowerPly Standard Cold Adhesive. a) Extend new roofing to cover fully cover the 115' x 35' area. 6) Strip in outside perimeter of new membrane with 3-course reinforcement of ELS and Burmesh. 7) At drains, remove clamping rings and extend new 2-ply membrane into drains and reinstall clamping rings. 8) At projection base flashings, extend 2-ply membrane up onto base flashing and install 3-cours reinforcement. 9) After repairs are complete, inspect area outside work area for damages and insulation fasteners that have broken through the existing membrane. a) Repair all damages with new 2-ply membrane as specified above. b. Clean work areas of all debris and trash. 3. Manor Hill Elementary - Roof A a. There are three (3) wet insulation area on Roof A, shown on the attached Diagnostic Survey. 1) Spud all gravel from the roof membrane. a) Extend gravel removal a minimum of two feet outside the wet areas. b) All removed gravel shall be evenly dispersed outside repair areas. 2) Clean and then prime the roof membrane with TremPrime QD. 3) Adhere 1-ply Burmastic Composite Ply HT and 1-ply of PowerPly Plus HT FR with PowerPly Standard Cold Adhesive. a) Extend new roofing outside wet areas a minimum of twelve (12) inches. 4) Strip in outside perimeter of new membrane with 3-course reinforcement of ELS and Burmesh. 5) At drains, remove clamping rings and extend new 2-ply membrane into drains and reinstall clamping rings. 6) At projection base flashings, extend 2-ply membrane up onto base flashing and install 3-cours reinforcement. b. Repair 100 lineal feet of loose metal edge flashing. 1) Spud gravel back from outside edge a minimum of twelve (12) inches. 2) Cut and remove loose flashing. 3) Prime repair areas with TremPrime QD. 4) Strip-in outside edge with 5-course reinforcement of ELS and Burmesh with widths of 4" and 6". 5) Feather repair onto roof membrane. c. Clean work areas of all debris and trash. 4. Manor Hill Elementary - Roof D a. There are two (2) wet insulation area on Roof D, shown on the attached Diagnostic Survey. 1) Spud all gravel from the roof membrane. a) Extend gravel removal a minimum of two feet outside the wet areas. b) All removed gravel shall be evenly dispersed outside repair areas. 2) Clean and then prime the roof membrane with TremPrime QD. 3) Adhere 1-ply Burmastic Composite Ply HT and 1-ply of PowerPly Plus HT FR with PowerPly Standard Cold Adhesive. a) Extend new roofing outside wet areas a minimum of twelve (12) inches. 4) Strip in outside perimeter of new membrane with 3-course reinforcement of ELS and Burmesh. 5) At drains, remove clamping rings and extend new 2-ply membrane into drains and reinstall clamping rings. 6) At projection base flashings, extend 2-ply membrane up onto base flashing and install 3-cours reinforcement. b. Repair 100 lineal feet of loose metal edge flashing. 1) Spud gravel back from outside edge a minimum of twelve (12) inches. 2) Cut and remove loose flashing. 3) Prime repair areas with TremPrime QD. 4) Strip-in outside edge with 5-course reinforcement of ELS and Burmesh with widths of 4" and 6". 5) Feather repair onto roof membrane. c. Clean work areas of all debris and trash.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents