Similar Projects
Social Row Road Improvements - SS-9 - City of Centerville
Infrastructure
Conception
$795,000 CJ est. value
Centerville, OH 45459

Bigger Road and Clyo Road - TC-1 - City of Centerville
Infrastructure
Conception
$1,701,000 CJ est. value
Centerville, OH 45459

Park Center Drive Senior Residential Development
New Construction, Infrastructure - 71,500 SF
Design
$64,800,000 CJ est. value
Dayton, OH 45414

Carriage Trails, Section 6, Phase V
New Construction, Infrastructure
Design
$9,500,000 CJ est. value
Huber Heights, OH 45424

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Rugby and Sunny view Plat Improvements
Infrastructure
Post-Bid
$265,355 est. value
OH

Spinning and Eastman, Phase II, Water Main Replacement
Infrastructure
Post-Bid
$899,919 est. value
OH

2021 Smart Water Metering
Results
Dayton, OH

Helke Road Watermain and Street Reconstruction
Term Contract
Results
Less than $800,000 est. value
Vandalia, OH

Homefull Campus
New Construction, Infrastructure - 12,000 SF
Construction
$14,000,000 CJ est. value
Dayton, OH 45417

GATED Global Industrial Park
New Construction, Infrastructure - 200,000 SF
Construction
$65,000,000 CJ est. value
Trotwood, OH 45426

Trinity Community at Beavercreek - United Church Homes
Addition, Demolition, Infrastructure - 168,000 SF
Pending Verification
$8,000,000 CJ est. value
Beavercreek, OH 45440

The Foodbank Expansion
Addition, Demolition, Infrastructure - 6,000 SF
Pending Verification
$5,188,349 CJ est. value
Dayton, OH 45417

Yankee Street (Winding Green Way to North Corportion) - City of Centerville
Infrastructure
Conception
$480,000 CJ est. value
Centerville, OH 45458

Last Updated 03/03/2023 04:03 PM
Project Title

Bayside and Barrett Water Main Replacement, Phase 2

Physical Address View project details and contacts
City, State (County) Dayton, OH 45402   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,248,561 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installing approximately 8000' of 8" DIP and 169 service stubs and reconnects. Fire hydrants and other appurtenances as show on the plans are also included. All Bids shall include the Bid Submittal Documents as defined in the Instructions to Bidders in Specification Section 00100. The County Commissioners reserve the rights defined in the Instructions to Bidders, including, but not limited to the right to reject any or all Bids and to waive any irregularities of Bids, should same be to the advantage of the County. Substantial Completion: 610 Contract Completion:640 As required by the governor’s “Executive Order 84-9”, the utilization of women shall be, at a minimum, that currently in use by the federal government as of February 15, 1984. This requirement stated at C.F.R. part 60-4 is 6.9 percent utilization of women. Bid Guaranty: Bidder shall furnish a Bid Guaranty, in the form prescribed in Sections 153.54, 153.57, and 153.571 of the Ohio Revised Code, in the form of either: (1) a bond for the full amount of the Bid in the form of the Bid and Performance/Payment Bond included in the Contract Documents in Specification Section 00410; or (2) a certified check, cashier's check, or irrevocable letter of credit in a form satisfactory to the Owner in an amount equal to 10% of the Bid. Bid amount shall be the total of all sums bid, including all add alternates, but excluding all deduct alternates. NOTE: AIA Bid Bond forms are not acceptable.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents