Similar Projects
Target #1750 Grocery Pick Up
Renovation - 500 SF
Post-Bid
Centerville, UT 84014

Tucano's Brazilian Grill Canopy
Renovation - 1,260 SF
Post-Bid
Farmington, UT 84025

Smith's Grocery Store #140-03
Renovation
Construction
Sunset, UT 84015

Smith's Grocery Store #444-05
Renovation
Construction
$1,600,000 est. value
Bountiful, UT 84010

Stephens South Weber
New Construction - 47,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
South Weber, UT

North Farmington Station West
New Construction
Pending Verification
Farmington, UT

Smith's Grocery #149-07
Renovation - 42,000 SF
Post-Bid
Layton, UT 84040

Tucano`S Brazilian Grill
Renovation - 10,120 SF
Construction
Farmington, UT 84025

Antelope Center
New Construction - 161,193 SF
Pending Verification
$10,000,000 CJ est. value
Sunset, UT 84015

Ramen Station
Renovation - 2,035 SF
Post-Bid
Farmington, UT 84025

DABC New Farmington Liquor Store
New Construction - 13,400 SF
Construction
Less than $4,100,000 est. value
Farmington, UT

South Weber Gateway
New Construction
Pending Verification
South Weber, UT 84405

Cafe Rio
Renovation - 3,939 SF
Construction
West Bountiful, UT 84010

Maverik
New Construction - 4,425 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Farmington, UT 84025

Maverik #381
Renovation - 3,988 SF
Construction
Layton, UT 84040

Reported 07/03/2021 12:00 AM
Project Title

Smith's Grocery Store #135-03

Physical Address View project details and contacts
City, State (County) Farmington, UT 84037   (Davis County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

2020 Within-the-Walls Remodel, Replacement of Sushi Prep Area & Cheese Island, Replacement of Refrigerated Fixtures, New Restrooms & Removal of Old Restrooms To Accommodate New Starbucks Kiosk, Relocate Floral Island, New Interior Decor & Painting

Details

1 Supermarket/Convenience Store, 1 Story Above Grade, Renovation, Food/Beverage Service.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents