Similar Projects
Yearly Labor Contract Electrical Services
Post-Bid
Tuscaloosa, AL

Electrical Parts
Post-Bid
Tuscaloosa, AL

2nd Avenue Overpass Project Power Relocation Package
Results
Tuscaloosa, AL

Z--Project 679-16-101 Electrical Upgrades
Results
$1,000,000 to $2,000,000 est. value
Tuscaloosa, AL

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Construction of the University Services Campus West Electrical Upgrades
Results
Tuscaloosa, AL

Hank Crisp Indoor Emergency Generator Installation
Post-Bid
Less than $150,000 est. value
Tuscaloosa, AL

FY 2018 ACDP Rowand-Johnson Hall Switchgear Replacement
Results
Tuscaloosa, AL

Farrah Hall Switch-Gear Replacement
Post-Bid
Tuscaloosa, AL 35401

Construction of the USC Lighting and Other Enhancements- Phase 1
Results
Tuscaloosa, AL

LED Relamping
Post-Bid
Tuscaloosa, AL 35403

Harper Center Generator Replacement
Results
Tuscaloosa, AL

MA-Electrical Repair and Maintenance Products
Results

Rose Administration Emergency Generator
Results
Tuscaloosa, AL

Medium Voltage Improvements - 4th Street East
Results
Less than $700,000 est. value
Tuscaloosa, AL

Last Updated 01/08/2019 02:15 PM
Project Title

J--Generator Maintenance - Tuscaloosa VA Medical Center

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL AL   (Tuscaloosa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description a. The contractor shall provide all labor, equipment, tools, materials, supervision, test equipment, travel and transportation necessary to perform annual preventive maintenance and inspections of the diesel generators along with checking the switchgears for each of the eleven (11) listed generators in accordance with current NFPA 99 and NFPA 100 testing and maintenance activities. b. Inspections shall include, but not limited to, assessing the prime mover's exhaust gas temperature against the minimum temperature recommended by the manufacturer (this information must be on the report). c. Contractor shall provide a minimum of four (4) continuous hours load bank with at least 30% of the nameplate rating to perform test. During the test, the dummy or load bank must be arranged so that it could be disconnected if power was lost to facility and the generator was needed for Medical Center use. d. This annual inspection (of the generators, etc.) must be accomplished during the month of January.
Details
Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 26 - Electrical, Packaged Generator Assemblies.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents