Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Rout and Seal
Infrastructure
Bidding
$400,000 CJ est. value
Chamberlain, SD 57325

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

2022 Airport Terminal Building
New Construction, Renovation, Infrastructure - 1,166 SF
Post-Bid
$7,500,000 CJ est. value
Chamberlain, SD 57325

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Interstate Cross Road Improvements, C and G, Sidewalk and Gravity Retaining Wall
Infrastructure
Results

Rout and Seal
Infrastructure
Bidding
$400,000 CJ est. value
Chamberlain, SD 57325

Asphalt Surface Treatment
Infrastructure
Results

Asphalt Concrete Resurfacing of Shoulders, Edge Drains, Repair STR Bridge, Joint & Spall Repair, Pipe Work, Lighting
Infrastructure
Results
$20,835,000 CJ est. value
Pukwana, SD 57370

Spot Asphalt Concrete Resurfacing on Various Routes in the Mitchell Area
Infrastructure
Results
$200,000 est. value
Aurora, SD

Signing and Delineation - Gravel Roads
Infrastructure
Results
$356,522 CJ est. value
Chamberlain, SD 57325

Aurora-Brule Rural Water System - Water System Improvements - 2022
Infrastructure
Results
$4,235,130 CJ est. value
Kimball, SD 57355

Aurora-Brule Rural Water System - Kimball Standpipe
Infrastructure
Results
$4,235,130 CJ est. value
Kimball, SD 57355

Last Updated 03/07/2023 03:33 AM
Project Title

Mill, AC Resurfacing, Pipe Work, Inslope Flattening

Physical Address View project details and contacts
City, State (County) Pukwana, SD 57370   (Brule County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $10,979,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I90 E & W - Fm Chamberlain E 8; I90L, I90WL, I90EL & I90WF - Fm 1.1 W of Exit 260 in Oacoma to Missouri River Bridge As of March 07, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - Mill, AC Resurfacing, Pipe Work, Inslope Flattening *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents