Similar Projects
Sand Spring Run Stream Bank Restoration
Design
Stroudsburg, PA

Dunbar Creek Flood Protection Project
Post-Bid
$500,000 to $1,000,000 est. value
Dunbar, PA 15431

Pipe
Post-Bid
Rome, Wysox, PA 18837

Doyle Avenue Landslide Repair
Results
PA

Butternut Lane Culvert Project
Results
Millville, PA 17846

Lake Association Pavilion - Drainage and Landscaping Construction
Post-Bid
Mountain Top, PA 18707

SR 866 Culvert Rehabilitation Project
Results
Williamsburg, PA

Reed Road Culvert Replacement Project
Post-Bid
New Castle, PA 16101

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Frame, Park Grate
Post-Bid
Philadelphia, PA 19107

Reconstruction of Mckinley Street Wall
Results
Export, PA

Green Forest Drive Culvert Replacement Project
Results
Baden, PA

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Wakefield Road Drainage Improvements
Results
Less than $147,623 est. value
PA

Hamilton Terrace Drainage and Pavement Improvements Project
Results
Lewistown, PA

Reported 06/18/2020 12:00 AM
Project Title

Shoulder and Slope Rehabilitation

Physical Address View project details and contacts
City, State (County) PA   (Somerset County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the resurfacing of the Turnpike eastbound and westbound median and shoulders as well as the mainline resurfacing of the travel lanes in the Allegheny Tunnel. Work will also include shoulder reconstruction, guide rail replacement, drainage channel reconstruction, and replacement of inlets including type A inlets with new inlets, and drain pipes. Additional work includes Somerset Maintenance and Pennsylvania State Police Barracks parking lots, North and South Somerset Service Plaza access ramps, installation of gabion basket slope remediation, rock armor, and maintenance and protection of traffic. Work items include, but are not limited to: 22,322 CY Excavation, Class 1, Class 1A, Class 1B, and Class 2 Excavation 356,235 SY Milling of Existing Bituminous Pavement, Various Depths 42,306 TON Superpave Asphalt Mixture Design, HMA Wearing Course, 2” Depth 4,293 TON Superpave Asphalt Mixture Design, HMA Binder Course, Various Depths 38,109 SY Shoulder Backup 35,651 CY Rock Armor, Modified, Various Types 6,143 CY Rock Blanket 16,850 LF Type 31-S Guide Rail 177 EACH Inlets, Various Conditions

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents