Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Major Reconstruction
Infrastructure
Design
$51,164,196 CJ est. value
Moraine, OH 45439

2022 Ada Ramp Improvement Program
Infrastructure
Bidding
$255,000 CJ est. value
Dayton, OH 45402

2022 Ada Ramp Improvement Program
Infrastructure
Bidding
$255,000 CJ est. value
Dayton, OH 45402

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Sheldon Water Main Replacement
Post-Bid
$1,004,792 est. value
OH

2020 Large Valve Rehabilitation
Results
Dayton, OH 45402

Bellefontaine Road Widening and Culvert Replacement
Results
Less than $900,000 est. value
Huber Heights, OH

Carriage Trails Phase VII
New Construction, Infrastructure
Pending Verification
$19,565,000 CJ est. value
Huber Heights, OH 45371

Carriage Trails Phase VII
New Construction, Infrastructure
Pending Verification
$19,565,000 CJ est. value
Huber Heights, OH 45371

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

Montgomery County Arthur Fisher Park Refinish North Tennis Courts Project Re-bid
Infrastructure
Bidding
$95,000 CJ est. value
Dayton, OH 45417

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Smart Water Metering
Results
Dayton, OH

Sheetz
New Construction, Infrastructure - 7,786 SF
Pending Verification
$1,000,000 CJ est. value
Huber Heights, OH 45424

Last Updated 08/23/2022 09:34 AM
Project Title

Evans Avenue and Genetta Drive Sanitary Sewer Replacement

Physical Address View project details and contacts
City, State (County) Miamisburg, OH 45342   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $440,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Evans Avenue and Genetta Drive Sanitary Sewer Replacement The project consists of removal and replacement of approximately 1,241 lineal feet of 8" sanitary sewer pipe, nine (9) manholes, reconnecting 20 associated service laterals, and restoration of pavement and site amenities. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than April 26, 2023. Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions and the requirement for a payment bond and performance bond for 100% of the contract price. The project will be funded through a WPCLF loan. The successful bidder shall comply with all related requirements as detailed in the Bidding Documents. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). The City of Miamisburg, Ohio reserves the right to reject any and all bids, to waive any informalities or irregularities, and further, reserves the right to accept any bids or parts of bids which it deems to best serve the interest of the City of Miamisburg, Ohio. The owner intends and requires that this project be completed no later than April 26, 2023. Engineer’s Estimate $ 440,000.00

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents