Similar Projects
Florence Columbus Road Warehouse
New Construction, Infrastructure - 1,000,000 SF
Conception
$40,000,000 CJ est. value
Fieldsboro, NJ 08505

Florence Columbus Road Warehouse
New Construction, Infrastructure - 1,000,000 SF
Conception
$40,000,000 CJ est. value
Fieldsboro, NJ 08505

Towneplace Suites by Marriott / Burlington
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Burlington Township, NJ 08016

South Church Street Senior Living Facility
New Construction, Infrastructure - 56,672 SF
Design
$4,000,000 CJ est. value
Mount Laurel, NJ 08054

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Temple Boulevard Improvement Project
Infrastructure
Results
$800,000 est. value
Palmyra, NJ 08065

Temple Boulevard Improvement Project
Infrastructure
Results
$800,000 est. value
Palmyra, NJ 08065

Removal of Underground Fuel Tanks and Surface Fueling Equipment
Infrastructure
Construction
$150,000 CJ est. value
Cinnaminson, NJ 08077

Sammy's Express Car Wash
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Mount Laurel, NJ 08054

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

Moorestown Mall Redevelopment Phase 1
New Construction, Infrastructure
Design
$85,000,000 CJ est. value
Moorestown, NJ 08057

RFQ Contractor - Construction Services Classroom Facilities
New Construction, Infrastructure - 9,500 SF
Post-Bid
$25,000,000 CJ est. value
Joint Base Mdl, NJ 08641

Monastery Site Improvements Project
Infrastructure, Alteration
Results
Mount Laurel, NJ

SBC Laundromat and Car Wash
New Construction, Infrastructure - 16,451 SF
Pending Verification
$2,500,000 CJ est. value
Westampton, NJ 08060

Last Updated 07/21/2023 11:08 AM
Project Title

2022 County Funded Overlay Program

Physical Address View project details and contacts
City, State (County) Mount Holly, NJ 08060   (Burlington County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $470,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The County of Burlington seeks bids for the provision of goods/services per the specifications. Pursuant to Section 2 of P.L. 1971, c.198 (C.40A:11-2), The successful bidder shall furnish and deliver a performance bond in the full amount (100%) of the total contract price within ten (10) days of the date of the contract award in accordance with N.J.S.A. 2A:44-147. The performance bond must be issued to The Board of County Commissioners of the County of Burlington by a surety company authorized to transact business in New Jersey. Deadline for inquiries or questions related to this bid shall be July 12, 2023, at 5:00 PM (local time). The second and third paragraphs of this subsection shell be changed deleted and replaced to: The bid shall be accompanied by a Bid Bond (Proposal Bond) or certified check or cashiers check for a sum of not less than 10% of the total contract price bid for the project, but not in excess of $20,000.00, made payable to the Treasurer of Burlington County . The Bid Bond (Proposal Bond) shall be properly filled out, signed, and witnessed and shall be furnished only by such Surety Company or Companies as are licensed and authorized to write Surety Bonds by the New Jersey Department of Insurance and in accordance with N.J.A.C.16:44- 7.3(e). The Contractor understands and agrees that all work must be performed in an orderly and closely coordinated sequence so that the date for substantial completion is met. If the Contractor fails to complete his work or fails to complete a portion of his work, he/she shall pay the County, as liquidated damages and not as a penalty, the sum as specified below. Such amount is agreed upon as a reasonable and proper measure which the County will sustain each calendar day by failure of the Contractor to complete the Work within the stipulated time. Substantial completion shall be determined by the County Engineer and shall be deemed completion of the whole work for purposes of tolling the Mechanic Lien Law. It is further understood by the Contractor that the County will suffer financial loss if the Project is not substantially complete on the date set forth in the Contract Documents. For damages occurring at the time of delay, the County may retain the amount due to him under this section from any payment due to the Contractor. The Contractor (and its Surety) shall be liable and pay to the County

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents