Similar Projects
Minooka Road Regional Lift Station and Force Main - Village of Minooka
Infrastructure
Conception
$450,000 CJ est. value
Minooka, IL 60447

Administration Parking Lot Replacement - County of Grundy
Infrastructure
Conception
$650,000 CJ est. value
Morris, IL 60450

0.7 MI of Mcclindon Rd in Channahon to 0.2 Mi W of Will Co Line
Infrastructure
Post-Bid
IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Intersections of IL 47 and Pine Bluff Road and at the Intersection of IL 47 and Southmor Road South of Morris
Infrastructure
Results
IL

Milling and Resurfacing on IL 113
Infrastructure
Results
$4,000,000 est. value
Coal City, IL 60416

Streator Onized Credit Union / Morris
New Construction, Infrastructure - 2,800 SF
Pending Verification
$650,000 CJ est. value
Morris, IL 60450

Streator Onized Credit Union / Morris
New Construction, Infrastructure - 2,800 SF
Pending Verification
$650,000 CJ est. value
Morris, IL 60450

Dupont Road Reseal - Grundy County
Infrastructure
Conception
$840,000 CJ est. value
Morris, IL 60450

Well 7 Construction, Contract 2-2021
Infrastructure
Post-Bid
$180,000 CJ est. value
Minooka, IL 60447

2022 Street Maintenance
Infrastructure
Results
$500,000 est. value
Morris, IL

Kankakee Road over Granary - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Gardner, IL 60424

HMA Surface Removal
Infrastructure
Post-Bid
$200,000 est. value
Gardner, IL

HMA Surface Removal, Tack Coat
Infrastructure
Results
$500,000 est. value
Morris, IL

Nettle Creek Bridge - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Morris, IL 60450

Last Updated 09/18/2023 03:06 PM
Project Title

Jewel Osco #3745 / Diamond

Physical Address View project details and contacts
City, State (County) Diamond, IL 60416   (Grundy County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

An awarded general contractor has been announced. Work includes a new grocery store at Diamond Marketplace. 09/14/23 Off-Site, Haul Road around pad, and winterized pad Complete (Not a part of bid) 11/06/23 Start Site Utility construction OR earlier 02/01/24 Start store construction (foundation) OR earlier (~240 calendar days to CC) 09/29/24 On-site & Store CC (~38 days to GO) 11/06/24 GO The project is located in the Village of Diamond Enterprise zone and is eligible for the 6.25% State sales tax exemption on Building Materials. Review the bid form breakdown on how to accommodate this deduction in your bid. For the bid, the BMEC deduction is an estimate and will be finalize later with the winning bidder when the GC contract is prepared. Bid Forms and Contracts: The project will have (3) primary Bid forms, contracts, Pay Apps, and continuation sheets: Addendum #1-#2 have been issued as of 8-3-2023. -New Store Construction and Fixture Install Bid Form, CSA contract, and GC PO -Site Development Bid Form, CSA contract, and GC PO -Refrigeration Installation Bid form and Installation PO In the Pre-Bid we will need to discuss the best way to estimate and track the BMEC deductions. We do not want the sales tax in the base bid, so we prefer to reconcile at the end of the project with a Change Order if required. Site Phasing: As part of the pre-bid meeting, we will walk thru the exact site phasing for this phase of the Shopping Center Project (Please see Diamond_ShoppingCenter_Phase-1_Site_Plan). Our primary scope for Phase 1 shopping center construction is: -Areas shown in Yellow below are to be 100% complete construction areas -Areas shown in Green will be rough graded with erosion control measures in place as clarified on the civil drawings -All shopping Center underground utilities shown on the Civil drawings to be completed as part of phase 1. -Detention area shown in blue below to be complete as part of Phase 1. Exact size and shape of Detention area per Civil drawings and as required for project fill. -The offsite work as already pulled fill from the Detention area and the depression can be seen on the site aerial. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. Site development drawings & specs have been issued as of 7-14-2023. Addendum #1 has been issued as of 7-26-2023. Addemdum #2 has been issued as of 8-3-2023.

Details

1 Story Above Grade, 63,918 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents