Similar Projects
Last Updated | 08/09/2022 08:38 AM |
Project Title | Bldg. 5183 Security Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Joint Base Lewis McChord, WA 98438 (Pierce County) |
Category(s) | Government/Public, Single Trades |
Sub-Category(s) | Military Facility, Security/Communications |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $25,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | BLDG 5183 Security Upgrade PS2227 - Joint Base Lew is McChord -Washington This is a Request for Quote 1. A Bid Bond is required (see section 00100, FAR Clause 52.228-1). 2. Performance and Payment Bonds are required (see section 00700, FAR Clause 52.228-15 and CD 2020-O0016). 3. As required by FARS 36.204, the estimated magnitude of this project is less than $25,000.00. 4. The NAICS for this acquisition is 238990, Office Building Construction (SB size standard $15.0 million). 5. This acquisition is for 100% small business concerns only; no large business bids w ill be accepted for this procurement. 6 The aw ardee of this contract w ill be required to provide a Superintendent through completion of the project (see section 00700, FAR Clause 52.236-6). 7. Project Manager, Quality Control and Superintendent Positions are considered key positions.These positions SHALL not be sub-contracted and must w ork directly for the prime contractor. 8. Venders are required to provide a valid CAGE Code (Block 14 FACILITY), Point of Contact (POC) and email address w ith their bid. Bidders are required to provide a CD copy of their RFQ submission. 9. RFQ opening shall be by electronic means only. Please read Instruction to Venders section for details. The contractor shall supply all supervision, labor, equipment, and materials toperform all work in strict accordance with the contract, this statement of work, and identified drawings to perform the necessary installations, and modifications to equip building 5183 with new cypher locks. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |