Similar Projects
City of West University Place Pavement Leveling
Post-Bid
West University Place, TX 77005

Traffic Mobility Improvements Phase II Project
Post-Bid
Pasadena, TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Upgrade Traffic Signals and Install Accessible Pedestrian Signal at 12 Downtown Locations
Results
Less than $1,392,352 est. value
Houston, TX 77002

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

HEB Houston 59 #656 Curbside
Renovation, Addition - 5,879 SF
Construction
$250,000 est. value
Cypress, TX 77433

Paving and Traffic Improvements
Post-Bid
$500,000 est. value
Houston, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Almeda & Orem RV Resort
New Construction - 4,448 SF
Construction
$3,700,000 est. value
Houston, TX 77045

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

Wrong-Way Detection Systems, Maintenance, Repair, Testing Services And Related Items
Results
$1,625,059 est. value
Houston, TX

Imperial Forest Section 5
Post-Bid
Houston, TX

FM 1960 - Intersection Improvements
Results
Less than $13,274,738 est. value
TX

Paver Project - University Park Building 11
Post-Bid
Houston, TX

Neighborhood Street ReconstructionNo. 460 (Subproject 2), Ashland Street
Results
Less than $1,670,993 est. value
Houston, TX 77251

Reported 07/13/2022 11:14 AM
Project Title

Gray and Taft Area Paving and Drainage - N-210008 - City of Houston

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $7,257,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project provides for the design and construction for concrete paving with storm drainage, curbs, sidewalks, driveways, street lighting and necessary underground utilities. The project addresses a need identified and prioritized through the ReBuild Houston Process utilizing a worst first methodology, objective data and benefit/cost analysis. The project will be designed and constructed to improve traffic circulation, drainage and safety in the service area. As of July 12, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents