Similar Projects
Purchase of Chopper Pumps
Infrastructure
Post-Bid
Gretna, LA

8-Inch Portable Water Pump
Infrastructure
Post-Bid
Convent, LA

Chiller Pumps Replacement at the Municipal Auditorium
Infrastructure
Results
$38,500 est. value
Shreveport, LA

FLYGT Pump
Infrastructure
Results
Slidell, LA

171 Tsurumi Pumps
Infrastructure
Post-Bid
Hahnville, LA

Controller Pumps for Jefferson Parish Public Works Warehouse
Infrastructure
Results
Gretna, LA

Submersible Gorman Rupp Pump
Infrastructure
Post-Bid
Hahnville, LA

George H. West Water Treatment Plant Wells G-8 and G-9 Starter Replacements
Infrastructure
Results
$300,000 est. value
Lake Charles, LA

Fire Pump Repairs
Alteration
Post-Bid
Pineville, LA

FY 2020 LCDBG Water System Improvements - Contract No. 2 - Mississippi Street Water Well
Infrastructure
Results
$1,285,000 est. value
Baker, LA

Red River Remove, Cap and Drill Two New Water Well
Term Contract
Post-Bid
$45,000 to $56,000 est. value
Bossier City, LA 71112

LA 182 University PS Pump 2 Motor Rehabilation
Infrastructure
Results
$50,000 est. value
LA

Masterplan Contract 1 Water Well
Infrastructure
Post-Bid
Cheneyville, LA

One Time Purchase of Three Submersible Pumps and Control Panels for the Jefferson Parish Sewerage Department
Term Contract
Results
Gretna, LA

Highway 1 South Well Field - Phase 2 - Site Work
Infrastructure
Post-Bid
$535,000 est. value
Alexandria, LA

Reported 07/07/2022 12:00 AM
Project Title

Drilling a Test Well at the Booster Station

Physical Address View project details and contacts
City, State (County) Iowa, LA 70647   (Calcasieu County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Jeff Davis Central Waterworks will be drilling a test well at the Booster station Jeff Davis Central would like to see 2 samples taken at an estimated depth of 500ft and 700ft. This is the necessary depth needed to reach the quality water we currently produce.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents