Similar Projects
Sewer Treatment Plant Expansion
Renovation, Addition
Conception
Katy, TX

Surface Water Treatment Plant Expansion
Addition
Design
$40,667,000 est. value
Sugar Land, TX

Water Supply Plant No. 1 - Phase 2
New Construction
Bidding

Water Supply Plant No. 2
New Construction
Bidding

Restoration and Hazard Mitigation of the May Pumping Plant
Post-Bid
Less than $4,144,000 est. value
TX 77583

2020 Water Plant Rehabilitations
Post-Bid
$1,500,000 est. value
Sugar Land, TX 77479

Water Well No.1 Rework and Water Plant Improvements 2020
Results
$626,000 est. value
Richmond, TX 77406

Water Plant Number 2 Project
Results
$3,700,000 est. value
Fresno, TX 77545

Stafford Run - Water Plant Recoating
Renovation
Bidding
Stafford, TX 77477

Construction of Water Plant Nos 1 and 2 Improvements 2022
Renovation
Post-Bid
$197,000 est. value
Richmond, TX 77407

Water Plant No. 7 - Plant Improvements
Results
Less than $1,080,437 est. value
Katy, TX 77493

Water Plant Phase 1
New Construction
Post-Bid
TX

Construction of Water Plant No. 1 Phase 1
Results
TX

The Refurbishment of Water Plant No. 1 Serving
Results
TX

Water Plant Expansion
Results
Richmond, TX 77469

Last Updated 03/15/2022 12:54 AM
Project Title

Tamarron Water Supply Plant - Phase 3

Physical Address View project details and contacts
City, State (County) TX   (Fort Bend County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents