Similar Projects
Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

Replace Building 48 Roof System
Term Contract
Design
$500,000 to $1,000,000 est. value
Hines, IL 60141

Roof Repair Replacement Authority-Wide (As Needed)
Alteration
Bidding
Chicago, IL

New Roof at Fire Station
Alteration
Bidding
$200,000 est. value
Lake in the Hills, IL 60156

2021 Coated Foamed Roofing Work
Post-Bid
North Chicago, IL 60064

Seasonal Grass Cutting Services
Term Contract
Post-Bid
Carlyle, IL 62231

Housing Rehabilitation Program - Roof, Gutters, Chimney, & Steps (Schweickhardt)
Renovation
Results
Rock Island, IL 61201

2021 Roof Replacement
Results
Wheeling, IL 60090

Redo the Roof on Village Hall
Alteration
Bidding
$182,000 est. value
Onarga, IL 60955

Elgin Mental Health Center Roof Repair & Maintenance
Term Contract
Post-Bid
Elgin, IL 60123

2021 Roofing Rehabilitation at Medinah Intermediate School
Results
Medinah, IL 60157

Macoupin County Public Health Department (MCPHD) Renovation Interior Renovations, Parking Lot, Roof
Infrastructure, Alteration
Bidding
$50,000 est. value
Carlinville, IL 62626

Replace Shingled Roofing Systems
Post-Bid
$3,500,000 est. value
Chicago, IL

2021 Roof Replacement at Maine South HS
Renovation - 32,400 SF
Results
Park Ridge, IL 60068

Commercial Building Roofs
Post-Bid
Du Quoin, IL

Last Updated 07/22/2022 10:09 AM
Project Title

Repair Roof - East West Cell House Phase 1

Physical Address View project details and contacts
City, State (County) Pontiac, IL 61764   (Livingston County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Prison/Jail, Roofing
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Capital Development Board is cancelling the solicitation, subject to Part 8: Section 8.2040 b(1)(A) of the procurement rules. The State no longer requires the supplies or services. MBE/FBE Subcontracting and Supplier Goals Apply Contractors will be required to enter into a Project Labor Agreement for the duration of the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers, Joint Sealants.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Facility Storm Drainage, Storm Drainage Piping Specialties, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents