Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Veterans Memorial Revitalization
Renovation
Post-Bid
Ferguson, MO 63135

2020 CRS Pavement Rehabilitation
Infrastructure
Results
MO

On-Call Roadway Maintenance
Term Contract
Post-Bid
Town and Country, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Results
Saint Louis, MO

Florissant Road Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

Asphalt Repairs
Infrastructure - 9,212 SF
Results
Clayton, MO

Frost Avenue Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

Ford Drive Road Construction
Infrastructure
Results
Ferguson, MO 63135

Paving & Engine Room
Infrastructure
Post-Bid
Breckenridge Hills, MO 63114

Last Updated 03/08/2023 11:31 PM
Project Title

Maryland Avenue Park Construction Project

Physical Address View project details and contacts
City, State (County) Clayton, MO 63105   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $512,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Primary Contact for questions is: Toni Siering, Director of Parks and Recreation tsiering@claytonmo.gov MSD # 12MSD-00565 The Scope of Work for this contract includes furnishing all labor and material required to complete the project. This includes coordination with utility companies for installation of new water service and electrical service. Utility coordination also includes removal of utility pole and meter pedestal identified on demolition plan. The work also includes erosion control measures necessary to protect sidewalks and roadways, grading of the site, and haul off excess fill material. Site improvements in the scope of work include replacing concrete curb and sidewalk, concrete installation, decomposed granite paving, concrete and brick retaining walls, concrete seat walls with wooden seat tops, storm drainage utilities, lighting, and electrical work. Also included in the scope are installation of a green wall system identified in the plans and details, landscape plantings, and irrigation. All questions shall be submitted in writing via email to tsiering@claytonmo.gov. No questions will be accepted after 5:00 PM on Thursday February 16, 2023.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents