Similar Projects
Publix - Summers Corner / Summerville (Ladson)
New Construction, Infrastructure - 51,454 SF
Conception
$12,000,000 CJ est. value
Ladson, SC 29485

Publix - Summers Corner / Summerville (Ladson)
New Construction, Infrastructure - 51,454 SF
Conception
$12,000,000 CJ est. value
Ladson, SC 29485

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Summerville, SC 29485

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Summerville, SC 29485

Springview Lane Drainage Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Summerville, SC 29485

RFP D/B - Summerville Fire-Rescue Station 6
New Construction, Infrastructure
Post-Bid
$3,094,921 CJ est. value
Summerville, SC 29485

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Reconstruction/Rehabilitation
Infrastructure
Results

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Widening - I-26 (187-194)
Infrastructure
Construction
$179,987,105 CJ est. value
Summerville, SC 29483

Widening - I-26 (187-194)
Infrastructure
Construction
$179,987,105 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

Last Updated 09/13/2023 11:05 AM
Project Title

Vantage at Summerville Apartments

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Developer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 13, 2023, no applications have been submitted for building permits. It is unknown whether a general contractor has been selected. The content team is currently making inquiries to this end. New Multi family complex - Garden style 14 buildings

Details

3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents