Similar Projects
Clark Road Hotel and Restaurant
New Construction - 3,750 SF
Conception
$31,000,000 est. value
Sarasota, FL 34233

Southwest Water Treatment Plant - U22SWT - City Of North Port
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
North Port, FL 34287

Whitaker Lofts
New Construction, Infrastructure - 24,096 SF
Design
$11,400,000 CJ est. value
Sarasota, FL 34236

Whitaker Lofts
New Construction, Infrastructure - 24,096 SF
Design
$11,400,000 CJ est. value
Sarasota, FL 34236

Civil/Site Construction Services
Post-Bid
FL

Resurfacing FY21, Increment 3
Post-Bid
Sarasota, FL

Low Bid Design Build River Rd From US 41 to I-75, Sarasota Co
Results
Less than $65,036,629 est. value
FL

Construction Services for Laurel Road Community Development
Results
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Pines of Sarasota Senior Living Facility
New Construction, Infrastructure
Construction
$120,000,000 CJ est. value
Sarasota, FL 34236

Comfort Inn Hotel
New Construction
Pending Verification
Venice, FL

Four Points by Sheraton / Venice
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Venice, FL 34239

Replace 10" AC Force Main From Liftstation #39 To Floyd/School Avenue - 002637 - City Of Sarasota
Infrastructure
Conception
$2,150,000 CJ est. value
Sarasota, FL 34237

Villa Ballada
New Construction, Infrastructure - 1,500 SF
Design
$8,700,000 CJ est. value
Sarasota, FL 34236

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Last Updated 10/26/2022 05:05 PM
Project Title

Four Points by Sheraton / Sarasota

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34239   (Sarasota County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes renovations and additions to a two building hotel. The western building will have a two story addition and the northern building will add one story. Renovations consist of new administrative and meeting space as well as new interior corridors. Scope details have not been released. As of October 26, 2022, this project has not applied for any permits with the City of Sarasota. Information regarding a general contractor and a method of selection has not been disclosed. A construction timeline has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5 Stories Above Grade, Addition, Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents