Similar Projects
South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

Rehabilitation Reclaimed Water Line
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Grand Canyon Village, AZ

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Nogales IoI Rehabilitation Phase 4 & 5
Term Contract
Bidding
$10,000,000 est. value
Nogales, AZ

New Water Loading Station Maintenance
Post-Bid
Fort Defiance, AZ

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Tankersley Water Line Replacement Area V - CMAR
Results
Gilbert, AZ 85296

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Water Distribution System Replacement
Renovation
Construction
$500,000 est. value
Tucson, AZ 85750

Transmission Mains - Southeast Mesa - CP0828 - City of Mesa
Infrastructure
Conception
$866,058 est. value
Mesa, AZ

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Alteration
Bidding
Phoenix, AZ 85009

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Chandler Boulevard Waterline Replacement (Chippewa Place to Meadows Drive)
Results
$1,800,000 to $2,200,000 est. value
Chandler, AZ 85224

Last Updated 06/29/2022 12:24 PM
Project Title

Y--Orpi-240821 - Replace Primary Park Water System for Maintenance and Housing Area

Physical Address View project details and contacts
City, State (County) Arizona City, AZ 85123   (Pima County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the Parks Primary Water System will restore various components related to the domestic and fire protection water distribution system within Organ Pipe National Park to address various system deficiencies. The existing system was constructed using asbestos-cement (AC) pipe. Some sections of the pipe have been replaced over the years since, but approximately 5500 linear feet of this pipe remains in service. The AC pipe frequently fails as rubber gasketed joints become brittle leading to points of leakage. Failure of these joints have drained the Park’s 100,000-gallon water storage tank. The two water storage tanks have also exceeded their life expectancy and have deteriorated due to the mineral content of the water. A supply well is producing at levels unacceptable to the park’s needs, and fire-fighting capabilities are compromised with less than sufficient fire flow to the existing hydrants. One of the Park’s two water wells (north well) is being replaced by a separate project. This project will replace the south well. The south well has deteriorated to an unacceptable level to maintain adequate water supplies for the Park. Degradation of the casing is occurring and iron deposits from oxidation are sealing perforations in the casing. Static water levels have dropped in recent years making the amount of available water less than desired levels. Water consumption has increased steadily as the park sees more and more visitors annually. The documented lower water table necessitates the need to drill a deeper well to maintain these services at expected levels. The goals of this project are to provide Organ Pipe National Park with reliable water systems which will meet or exceed flow capacity requirements for domestic water and fire protection for years to come, allow staff to streamline the monitoring and oversight of these systems and significantly reduce service disruptions and operation and maintenance costs.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents