Similar Projects
BES Flooring Replacement
Alteration
Bidding
Blackshear, GA 31516

Flooring Removal and Installation Services
Alteration
Bidding
GA

Strip and Reseal Two Gymnasium Floors and One Danc
Post-Bid
Cumming, GA 30040

Flooring Demo and Install at Athens Field Office
Post-Bid
Athens, GA 30606

MXG Carpet
Results
Moody AFB, GA 31699

Roybal Flooring Replacement
Results
$1,000,000 to $5,000,000 est. value
Atlanta, GA

Sawnee Elementary Tile Floor Replacement
Alteration
Bidding
Cumming, GA 30040

Floor Finishing Raw Materials
Term Contract
Post-Bid
Valdosta, GA

Polished Concrete Flooring
Results
Douglasville, GA 30135

Installation and Repairs of Various Types of Flooring - Annual Contract
Term Contract
Bidding
GA

Floor Stripping Raw Materials
Post-Bid
Decatur, GA

Gym Floor Replacement At Myers Middle School And Shuman (Esplost) Elementary School
Results
Savannah, GA 31400

Removal, Installation of New Flooring at Hearthsto Lodge
Post-Bid
Cumming, GA 30040

Freedom Park K-8 Media Center Flooring
Alteration
Results
Augusta, GA 30905

Removal, Installation of Flooring at Fire Stations 2 and 12
Post-Bid
Cumming, GA 30040

Reported 12/22/2021 12:00 AM
Project Title

Tile Replacement Milledgeville Fire Rescue

Physical Address View project details and contacts
City, State (County) Milledgeville, GA 31061   (Baldwin County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Protect the grounds and surrounding area from damage during work. Demo of the tile floors and walls in dormitory bathroom showers. Demo of the tile floor, walls tub and closet in the administrative bathroom. All construction debris shall be removed by the contractor. Replace the tile floor in the administrative bathroom and completely replace the tile in both of shower area of all three (3) bathrooms. Install three (3) new elongated chair height toilets in all bathrooms. Install vanities in the administrative – full vanity and dormitory bathrooms – base cabinet & full vanity. Install three (3) exhaust fans in all bathrooms. Install FRP panels on the walls in the dormitory bathrooms only. Includes five (5) year workmanship warranty against any work from contractor and to include manufacturer’s warranty on all parts. Add install showers in all three (3) bathrooms. Repair any incendital plumbing issues due to the project. Contractors will be required to measure the work site. Contractor will be responsible for site visit and for all field measurements.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents