Similar Projects
Silver Lane Sidewalk and Pedestrian Bridge
Renovation, Infrastructure
Bidding
$80,000 est. value
East Hartford, CT 06138

Farmington River Bike Trail Improvements
Renovation, Infrastructure
Bidding
$800,000 est. value
Canton, CT

Rental of Bridge Repair Units
Post-Bid
Hartford, CT

Covey Road Bridge Over Bunnell Brook
Renovation
Post-Bid
Burlington, CT 06013

Replacement of Bridge No. 03023 Sigourney Street over Capitol Ave
Results
$10,000,000 to $14,999,999 est. value
Hartford, CT 06105

Rehabilitation of Bridge No. 05844A Carrying I-84 over Route 15
Results
$1,000,000 to $2,499,999 est. value
East Hartford, CT

Tomlinson Avenue over Quinnipiac River Contract
New Construction
Post-Bid
Plainville, CT

Rehabilitation of Bridge 04105 Memorial Boulevard Over Pequabuck River
Results
Bristol, CT 06010

Installation of Bridge Deck Joints
Renovation, Term Contract, Infrastructure
Post-Bid
$10,000,000 est. value
Hartford, CT

Replacement of Griffin Road Bridge and Hungary Road Bridge
Results
$1,000,000 to $3,000,000 est. value
Granby, CT

Foote Road Over Burlington Brook
Infrastructure
Post-Bid
Burlington, CT

Replacement of Bridge No. 004-012 Cider Brook Road Over Cider Brook
New Construction, Infrastructure
Results
Avon, CT 06001

Replacement of Bridge 048012 Orlando Drive Over Beemans Brook
New Construction, Infrastructure
Post-Bid
$870,000 est. value
Enfield, CT 06082

Resurfacing of Main Street between Park Street and Gold Street and Rehabilitation of Bridge No. 05354 Boce Barlow Way over Amtrak and Connecticut Southern Railroad
Renovation, Infrastructure
Results
Hartford, CT

Rehabilitation of Bridge No 05944, I-291 and King Street Over Podunk River
New Construction, Infrastructure
Results
$2,500,000 to $2,500,000 est. value
South Windsor, CT

Last Updated 07/18/2022 07:29 AM
Project Title

Rehabilitation of Moosehorn Road Bridge over Moosehorn Brook

Physical Address View project details and contacts
City, State (County) Granby, CT 06035   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents