Similar Projects
Upgrade HVAC
Alteration
Bidding
Saint Louis, MO 63110

HVAC Services for the Philips Park Pavilion
Addition
Bidding
Columbia, MO 65201

Summer 2022 HVAC Package
Alteration
Sub-Bidding
Smithville, MO 64089

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Virginia Avenue Housing Complex, Heat Pump Replacements
Results
$85,500 to $95,000 est. value
Columbia, MO 65201

Kitchen Hoods Inspection and Cleaning
Results
Columbia, MO 65202

Shepard Boulevard Elementary HVAC Replacement
Alteration
Bidding
Columbia, MO 65201

Repair of East Cooling Tower for the City of Columbia Municipal Power Plant
Post-Bid
Columbia, MO 65201

Lange Middle Cooling Tower and Chiller Replacement
Results
Columbia, MO 65202

HVAC Control System Replacement at Vesper Hall
Alteration
Bidding
Blue Springs, MO 64014

HVAC Services (City-Wide)
Term Contract, Alteration
Post-Bid
Springfield, MO

Heating Equipment
Results
Belton, MO 64012

Portable Air Filtration Systems
Alteration
Bidding
MO

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Last Updated 12/03/2021 08:30 AM
Project Title

HVAC Controls and HVAC Replacement

Physical Address View project details and contacts
City, State (County) Kirksville, MO 63501   (Adair County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolition to include but is not limited to (16) heat pumps, (4) air handling units, (3) energy recovery units, approximately 100 underfloor air terminal variable volume boxes and HVAC controls and some ductwork and piping. 2. Furnish and install new web based Direct Digital Control system for the HVAC system. Existing sensors are to be removed and replaced; other equipment may be reused if compatible with the new Direct Digital Control system. Actuators on dampers are to be replaced. Wiring is to be replaced for the new DDC system. 3. Furnish and install sixteen (16) heat pumps. 4. Furnish and install three (3) energy recovery units. 5. Furnish and install ductwork and piping. 6. Furnish and install electrical equipment needed for the new HVAC equipment. 7. Training of Owner’s personnel on the new system shall be included in the total base bid price.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents