Similar Projects
SR-154 13800 S to I-15 Preservation High Volume
Infrastructure
Bidding
Less than $500,000 est. value
UT

Midas Creek Asphalt Trail and Pedestrian Bridge
New Construction, Infrastructure
Bidding
South Jordan, UT 84095

2020 Shoulder Improvements
Post-Bid
Sandy, UT 84070

Highland Drive Widening and Reconstruction
Post-Bid
Draper, UT 84020

Sandy City 2020 Overlay Project
Results
Sandy, UT 84070

Mill and Overlay 2020 Project
Results
Murray, UT 84123

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Murray Mill and Overlay 2021
Infrastructure
Bidding
Murray, UT

2020 Trails Pavement Maintenance Project
Post-Bid
Draper, UT 84020

Relocation of Gates 10 and 11
Results
Salt Lake City, UT

US - 89 Victory Road to Davis Co Line
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
Salt Lake City, UT 84103

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

I-215; Various Locations Preservation - Roadway
Results
$500,000 to $1,500,000 est. value
UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Bidding

Chip Seal Type II Project
Post-Bid
UT

Last Updated 09/15/2021 02:27 PM
Project Title

Pinecrest Canyon and Killyons Lane Pavement Project

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84108   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: 1. Killyons Lane work consists of rehabilitating the existing asphalt (mill and overlay to depths as specified in the plans), and paving a section of roadway (approximately 0.3 miles) that is currently unpaved, and other work as may be detailed on the plans. 2. Pinecrest Canyon Road work (from Station 00+00 to Station 45+00 and from Station 115+00 to the End) consists of rehabilitating the existing asphalt (mill and overlay to the depths as specified in the plans), installing 420’ of 15” RCP pipe and associated drainage structures, reconstructing approximately 100’ of roadway (raising the roadway elevation) including installing a new culvert pipe and tying in adjacent driveways, and lowering and raising roadway utilities (water valves, manholes, monuments, etc.), and other work as may be detailed on the plans. Bid Alternate 1 1. Pinecrest Canyon Road work (from Station 45+00 to Station 115+00) consists of rehabilitating the existing asphalt (mill and overlay to the depths as specified in the plans), reprofiling (adding a crown) approximately 500’ of roadway including a roadside ditch and associated drainage features, lowering and raising roadway utilities (water valves, manholes, monuments, etc.), and other work as may be detailed on the plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents