Similar Projects
Water Source Heat Pumps, Curtis, Hopkins, Weaver, and Wells Elementary Schools
Bidding
$1,000,000 to $2,999,999 est. value
Chester, Midlothian, Richmond, VA 23831

HVAC Cleaning - 10 Locations at Defense Supply Center Richmond, VA
Post-Bid
Richmond, VA

HVAC Preventative Maintenance and On Call / Multiple Locations
Term Contract
Post-Bid
Appomattox, Chesterfield, Glen Allen, Salem, Wytheville, VA 23235

HVAC Improvement Main Terminal First Floor
Results
Richmond, VA 23250

Madison Basement AHU Replacement
Results
Richmond, VA

Heating, Ventilation and Air Conditioning Services for DGS
Post-Bid
Richmond, VA

HVAC Preventative Maintenance
Term Contract
Results
VA

MERV 13 Air Filters
Post-Bid
Richmond, VA

Modern Green High-Efficiency HVAC System
Results
Richmond, VA

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace Auditorium AHU and Piping Insulation
Results
Richmond, VA

Air Purifier with Hepa Filter
Post-Bid
Richmond, VA

Chiller and Cooling Tower Preventative Maintenance and Repair
Term Contract
Results
Richmond, VA

Replacement of AHU 11
Post-Bid
Richmond, VA

Chiller Maintenance and Repair Services
Results
Richmond, VA

Last Updated 07/17/2020 12:21 PM
Project Title

HVAC Renovations at Chesterfield County Airport

Physical Address View project details and contacts
City, State (County) Chesterfield, VA   (Chesterfield County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the replacement of all HVAC systems and is generally described as rooftop units, kitchen hood system, exhaust fans, PTACs, split systems and all associated ductwork. Provisions include (2) single zone rooftop units and (1) packaged rooftop HVAC system serving terminal units with new curbs. A gas meter will be replaced with (2) new gas meters to be coordinated with the local gas utility. Provisions for a new kitchen hood with a fire suppression, make-up air and exhaust fans shall also be included. Terminal units will be installed for local temperature control in the Administration and Operations side of the building. A complete automatic temperature controls replacement is included. Electrical provisions to support the mechanical work are also included.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents