Similar Projects
Replace Siding at Pier 1 Shed
Term Contract
Post-Bid
$200,000 to $250,000 est. value
Hilo, HI

Day-Use Moorings Kona Installation, Inspection, and Maintenance
Infrastructure
Post-Bid
$200,000 est. value
Honolulu, HI

Wailoa Small Boat Harbor Bulkhead Fender Repairs
Infrastructure
Results
$500,000 est. value
Hilo, HI 96720

Substructure and Electrical Repairs at Pier 36
Infrastructure
Post-Bid
$1,000,000 to $1,500,000 est. value
Honolulu, HI

Substructure Repairs at Pier 1 Hilo Harbor
Infrastructure
Results
$1,500,000 est. value
Hilo, HI

Substructure and Waterline Repairs at Pier 2
Infrastructure
Post-Bid
$1,000,000 to $2,000,000 est. value
Honolulu, HI

Reported 06/24/2022 12:00 AM
Project Title

Repair Ammunition Wharf W2

Physical Address View project details and contacts
City, State (County) HI   (Honolulu County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project proposes to repair Ammunition Wharf W2 by replacing it with a reinforced concrete wharf on concrete piles built to current standards. The project will be divided into two phases, fiscal year FY22 and FY23. Phase 1 will consist of the portion of W2 closest to W1 and Phase 2 will consist of the portion of W2 closest to W3. Scope of the work for each phase is identical and will include demolition of the existing timber pile fender system and wharf deck. Sheet piling will be installed inboard of the wharf structure. A fender system will consist of pre-cast concrete piles and plastic wales and chocks. Pile clusters will be provided to accommodate foam filled floating fenders. The project will also include the reconstruction of wastewater and portable water utility systems, phone lines and grounding system for lighting protection. Utilities will be placed into a utility trench built into the wharf deck. Permanent oil spill containment boom, safety ladders, life ring cabinets, fire alarm system and mooring hardware will be installed.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents