Similar Projects
Corbett Ground Storage Tank
Infrastructure
Bidding
$300,000 est. value
Schertz, TX

2020 CMOM Package 1 (Large Diameter)
Infrastructure
Bidding
$8,799,198 est. value
San Antonio, TX

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Street Reconstruction - Linwood Oaks and Orange Circle and Orange Circle Waterline
Results
Less than $1,493,273 est. value
Pearland, TX 77581

Annual Water Meter Valve Replacement Contract
Term Contract
Results
$120,000 est. value
Baytown, TX 77520

Knob Creek Basin Wastewater Projects
Infrastructure
Pending Verification
$28,930,000 est. value
Temple, TX

Ground Storage Tank Replacement
Post-Bid
TX

Valve Repair Annual Service
Term Contract
Results
Sugar Land, TX 77487

Coast Guard Station Freeport Waterline Repairs
Post-Bid
$10,000 to $25,000 est. value
Surfside Beach, TX 77541

Water Distribution, Sanitary Sewer and Drainage Facilities to Serve Landing at Delany Cove Sec. 13 and Ditch 9 Channel Improvements Phase II
Results
La Marque, TX 77568

PVC Coupling, SDR-35 Y-Branch, Connector, and Pipe Insert Various Sizes
Post-Bid
Houston, TX

Proposed Water Lines to Emerald Forest UD Water Plants No.2 and 3 (F1), Mils Road MUD Water Plants No. 1 (F2) and 2 (F1), Cypress Creek UD Water Plant No. 1 (F3) and HCMUD No. 230 Water Plant (F3)
Results
$8,000,000 to $10,000,000 est. value
Houston, TX

Replace Water Storage Tank with Feed Water System
Post-Bid
Brownwood, TX

Rehabilitation of 6.0 MG Celestial Ground Storage Tank
Results
Dallas, TX

Last Updated 05/24/2022 08:06 AM
Project Title

Contract 1 Pineland Water Plant and Transmission Lines

Physical Address View project details and contacts
City, State (County) TX   (Sabine County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of rehabilitation of the Pineland Water Plant including piping modifications, chlorination equipment, renovation of existing building, and new hydropneumatic pressure tank, installation of approximately 68,986 LF of new PVC waterline varying in size from 4” to 10” including all valves, fittings, and necessary appurtenances, and other miscellaneous items of construction. Alternate bids include rehabilitation of the King Cemetery Plant including a new ground storage tank and a new hydropneumatic pressure tank, a new natural gas generator at the Pineland Water Plant, and rehabilitation of a ground storage tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Packaged Generator Assemblies.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents