Similar Projects
Sanitary Sewer Improvement
New Construction, Alteration
Bidding
$1,100,000 est. value
Horace, ND

3rd Street Lift Station Improvements
Renovation
Bidding
$200,000 est. value
Grafton, ND 58237

West End Lift Station Improvements
New Construction
Post-Bid
$150,000 to $250,000 est. value
Valley City, ND

Master Lift Station Improvements
New Construction
Post-Bid
$150,000 to $250,000 est. value
Valley City, ND

South Regional Water Connection Phase 2
Results
$2,000,000 est. value
Fargo, ND

GSR and Pump Station Replacement
Results
$1,200,000 est. value
Cavalier, ND

Wastewater Treatment Facility
New Construction, Infrastructure
Bidding
$2,014,685 est. value
Strasburg, ND

UND Aerospace Apron Reconstruction Phase 2
Renovation, Alteration
Post-Bid
Grand Forks, ND 58202

Fargo Red River Pump Station Improvements
Renovation
Results
$5,500,000 est. value
Fargo, ND

Lift Station Rehab - Reconstruction
New Construction
Bidding
$6,998,420 est. value
Fargo, ND

Leachate Forcemain and Lift Station
Results
$801,000 est. value
Dickinson, ND

Upgrade Lift Station 12 and Lift Station 13
Renovation
Results
$775,000 est. value
Grand Forks, ND

Lift Station Improvements
Renovation
Results
$800,000 est. value
Jamestown, ND

Sewer Improvement District No. 2019-1
Results
$5,000,000 to $5,400,000 est. value
Kindred, ND

Velva Goldade Lift Station Replacement
Renovation
Results
$400,000 to $500,000 est. value
Velva, ND

Last Updated 04/28/2022 07:30 AM
Project Title

Flood Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Wahpeton, ND   (Richland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $473,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The remodel of Storm Pump Stations 2, 3, 4, 5, and 6 electrical components including new control panels, new meter sockets, rerouting/extending existing conduits and wiring, and other miscellaneous items. The project will consist of the following approximate quantities: 1 LS Pump Station 2 Demolition and Remodel 1 LS Pump Station 3 Demolition and Remodel 1 LS Pump Station 4 Demolition and Remodel 1 LS Pump Station 5 Demolition and Remodel 1 LS Pump Station 6 Demolition and Remodel Traffic Control and all miscellaneous work necessary therefor and incidental thereto.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents