Similar Projects
Four Seasons Storage Facility
New Construction
Conception
Shorewood, IL 60404

ShipBob Fulfillment Centers Master Plan
New Construction
Conception
Chicago, IL 60607

Compass Global Logistics Hub
New Construction
Design
$1,700,000,000 est. value
Joliet, IL 60436

Able Masonry Building Addition
New Construction - 4,965 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lockport, IL 60446

Salt Storage, Generator and Sewer Connection Phase 2 (General)
New Construction
Bidding
Less than $500,000 est. value
Carrollton, Hamel, Jerseyville, IL

Salt Storage, Generator and Sewer Connection Phase 2 (General)
New Construction
Bidding
Less than $500,000 est. value
Carrollton, Hamel, Jerseyville, IL

Shabbona Lake State Recreational Area - Storage Building
New Construction - 4,320 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Shabbona, IL 60550

Cold Storage Building
Post-Bid
Vermilion, IL 61955

Timber Salt Storage Building
Results
Less than $255,474 est. value
De Kalb, IL 60115

2020 Salt Shed
Results
Rantoul, IL 61866

McMaster Carr Warehouse Expansion
Addition
Construction
Elmhurst, IL 60126

Industrial Building
New Construction - 175,414 SF
Construction
$10,000,000 CJ est. value
Elmhurst, IL 60126

Planned Redevelopment
New Construction, Demolition - 825,000 SF
Pending Verification
$10,000,000 CJ est. value
Glenview, IL 60026

Monarch Business Park
New Construction - 431,020 SF
Pending Verification
$10,000,000 CJ est. value
Elmhurst, IL 60126

Retail & Warehouse
New Construction
Conception
Chicago Ridge, IL 60415

Last Updated 01/04/2022 11:39 AM
Project Title

Amazon Delivery Station

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60014   (McHenry County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 183,000 SF New Construction, 63 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents