Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Mount St. Helens Spirit Lake Intake Headwall
Alteration
Bidding
$10,000,000 to $20,000,000 est. value
Cougar, WA 98616

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Jan Road Levee Setback Construction
Alteration
Design
$9,000,000 est. value
WA

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
WA

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Fall City Floodplain Restoration Planting
Alteration
Design
$1,000,000 est. value
WA

Downtown Stadium
Alteration
Bidding
Spokane, WA 99207

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Last Updated 03/08/2022 11:57 AM
Project Title

Thorndyke Road MP 4.71 Culvert Replacement

Physical Address View project details and contacts
City, State (County) State-Wide: WA
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,656,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the removal of the existing culverts, installation and removal of a temporary traffic bypass, installation of a new buried bridge, structural earth walls, HMA wearing surface, guardrail, reconstruction of stream channel and installation of large woody debris, and other work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents