Similar Projects
Elmwood Estates Addition - City of Broken Arrow
Infrastructure
Conception
$312,000 est. value
Broken Arrow, OK

Turtle Creek Phase 2 - City of Broken Arrow
Alteration
Conception
$365,400 est. value
Broken Arrow, OK

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 est. value
Tulsa, OK 74127

US-64 and US-169 - Interchange
Infrastructure
Design
$7,445,109 est. value
Bixby, OK 74008

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Bidding
$5,000,000 CJ est. value
Tulsa, OK 74115

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Bidding
$5,000,000 CJ est. value
Tulsa, OK 74115

Aggregate
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

Backfill Sand
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

Highway Sweeping Services
Infrastructure
Post-Bid

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Pavement Rehabilitation (p.c.) and Bridge Rehabilitation
Results
Tulsa, OK

Safety Improvement
Results
Tulsa, OK

Pancho Anaya Bakery
Addition, Demolition, Renovation, Infrastructure - 11,700 SF
Pending Verification
$2,394,737 CJ est. value
Tulsa, OK 74128

Creekside Villas at Forest Ridge
New Construction, Infrastructure
Pending Verification
$16,500,000 CJ est. value
Broken Arrow, OK 74012

Brentwood - Concrete Panel Replacement - City of Broken Arrow
Infrastructure
Conception
$1,000,000 CJ est. value
Broken Arrow, OK 74012

Last Updated 08/02/2022 02:03 PM
Project Title

Citywide Non-Arterial Mill, Patch and Overlay

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,033,860 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Citywide Non-Arterial Mill, Patch and Overlay - This work shall consist of furnishing and placing an engineered, pre-coated paving mat within the pavement structure as shown on the plans or directed by the engineer. The paving mat shall provide a moisture barrier/stress relieving membrane and shall be placed beneath a specified asphalt concrete (AC) mix overlay of either, hot-mix asphalt (HMA), warm-mix asphalt (WMA) or rubber hot-mix asphalt (RHMA) - consist of installing Truncated Domes. -consist of furnishing and placing, High Early Strength Concrete. Pre-Qualification Classification - A or C SBE Utilization - 10%

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents