Similar Projects
UC ELC Facade Repair
Alteration
Bidding
$250,000 est. value
Cincinnati, OH 45220

Overhead Door Parts, Maintenance, and Repair Services
Post-Bid
Cincinnati, OH 45202

Roofing Repair and Maintenance
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

UC Memorial Hall Roof & Facade
Results
Less than $3,582,500 est. value
Cincinnati, OH

Restoration of the Cincinnati Gateway at Bicentennial Commons
Post-Bid
Cincinnati, OH

TUC Flat Roof Revitalization
Results
Less than $844,000 est. value
Cincinnati, OH 45219

Doors Replacement
Post-Bid
Cincinnati, OH 45204

Hamilton County East Garage Stair Repairs Project
Results
Less than $235,300 est. value
Cincinnati, OH 45202

Paul Brown Stadium Overhead Door Service Calls
Term Contract
Post-Bid
Cincinnati, OH 45202

UC Logan Hall Roof Replacement
Results
Less than $414,832 est. value
Cincinnati, OH

Golden View Acres Roof Replacement
Alteration
Post-Bid
$130,000 est. value
Sharonville, OH 45241

UC Kettering Kehoe-Mid Wing Roof Replacement
Results
Less than $1,250,000 est. value
Cincinnati, OH 45267

Nagel Middle School - Roof Replacement
Alteration
Post-Bid
Cincinnati, OH 45255

Community Center Roof Replacement Phase 1
Results
Less than $283,000 est. value
Springdale, OH 45246

Reported 02/09/2022 12:00 AM
Project Title

Gymnasium Roof Replacement, Parapet Walls, Glass Block Window Replacement and Gymnasium Entrance

Physical Address View project details and contacts
City, State (County) Dillonvale, OH   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Roofing, Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Gymnasium roof replacement: Remove the existing roofs and insulation down to the deck; remove loose membrane flashings; remove all debris from the roof and haul away to an approved landfill. Inspect the existing decking and report any problems to the owner. All repairs will be approved by owner on a time and material basis. Provide and install new wood blocking on top of parapet walls. Over the entire aria, apply a continuous layer of tapered insulation with a minimum thickness of 1.5 at the roof drain. Over the new insulation, apply a 60 mil, fully adhered, EPDM rubber roof system. At all walls and curbs, install membrane flashing. Mechanically attach the new flashing continuously along the top edge. Apply manufacturer approved flashing systems at all pipes, drain, metal drain boxes, and other projections. Provide and install new coping fabricated from 24-gauge galvanized steel with kynar 500 coating. Provide and install new Retro-Fit roof drains. Perform all work in strict accordance with the manufacturer s printed specifications. Perform only as much work that can be made watertight that day. Comply with all State and Federal Regulations. Upon completion, furnish manufacturer s written warranty for labor and materials for 20 years. Remove the existing roof decking and provide and install new metal decking over the entire roof area. Metal decking will be 3 N Roof Deck, 22 gauge, G60 Galvanized. Gymnasium parapet walls: Remove the face brick and backup brick down to the support lintels. Replace support lintels. Relay face brick and backup brick. Install helical anchors. Clean new brick. Remove all construction debris and garbage from the job site. Block window replacement: Remove the glass block and sills from the twelve window openings. Install bloc and brick veneer to make a smaller opening. Install a smaller glass block window in the new opening. Remove all construction debris and garbage from the job site. Gymnasium entrance: Remove the coping stones from above the main entrance. Remove the face brick and backup brick from above entrance. Remove the limestone from above the main entrance. Remove I-beam. Install new I-Beam. Install new limestone. Install new face brick and backup brick. Reinstall coping stones. Remove all construction debris and garbage from the job site.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents