Similar Projects
MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Fore Street Sewer Separation - City of Portland
Infrastructure
Conception
$2,000,000 CJ est. value
Portland, ME 04101

Carr Woods
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cape Elizabeth, ME 04107

Highland Avenue Land Reclamation
Infrastructure
Design
Scarborough, ME 04074

Windham Field Allen SRRF Underground Sprinkler and Domestic Water Service Upgrade
Post-Bid
Windham, ME 04062

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Replacement in Narragansett Street
Infrastructure
Results
Gorham, ME 04038

Water Line to North Windham Fire Station
Infrastructure
Results
Windham, ME

Stevens Square at Baxter Woods Apartments / Portland
New Construction, Infrastructure
Construction
$60,800,000 CJ est. value
Portland, ME 04103

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Cummings Road Cannabis Cultivation Facility
New Construction, Infrastructure - 23,940 SF
Pending Verification
$2,500,000 CJ est. value
South Portland, ME 04106

Inflow and Infiltration Phase 3 Mitigation - City of Portland
Renovation
Conception
$1,100,000 CJ est. value
Portland, ME 04101

New Primary School / Scarborough
New Construction, Infrastructure
Design
$27,000,000 CJ est. value
Scarborough, ME 04074

Water / Sewer Service Installation at 145 Allagash Drive
Infrastructure
Post-Bid
Brunswick, ME 04011

Water Line and Utility Vaults MM 47.1, MM 47.6, and MM 48.5
Infrastructure
Results
Less than $1,000,000 est. value
Portland, ME

Last Updated 09/14/2022 09:39 AM
Project Title

Inflow and Infiltration Program Phase 1 Mitigation Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,797,050 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Infiltration Program Phase 1 Mitigation Sewer Rehabilitation project is located on various streets in the south-western corner of the City. Outline of Work : The project includes, but, is not limited to the following items: 1. Ultraviolet Cured in-Place-Pipe lining services and restoration of services of the following pipe diameters and approximate lengths: 8" Diameter 15,500 linear feet 10" Diameter 3,300 linear feet 12" Diameter 4,200 linear feet 15" Diameter 4,200 linear feet 18" Diameter 4,500 linear feet 20 & 21" Diameter 1,350 linear feet 24" Diameter 1,500 linear feet 27" & 30" Diameter 2,500 linear feet 36" Diameter 1,450 linear feet 42" Diameter 1,100 linear feet 48" Diameter 250 linear feet. The Contractor shall make note of the schedule and sequence requirements presented in the contract documents. The City intends to start this project as soon as possible after the bid is awarded. NOTE: There will be no pre-bid meeting for this project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents