Similar Projects
Applewood Pointe Roadway Improvements
Infrastructure
Bidding
$600,000 est. value
Apple Valley, MN 55124

Sucker Creek Bridge Culvert Replacement
Infrastructure
Bidding
$183,000 est. value
Mahnomen, MN

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

Ryan Drive and Keller Parkway Conveyance Upgrades
Post-Bid
$808,000 est. value
Little Canada, MN 55117

Directional Boring
New Construction
Results
Minneapolis, MN 55401

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Len Hardy Memorial ATV/Snowmobile Trail
Infrastructure
Bidding
$100,000 est. value
Grand Rapids, MN

Road Materials
Post-Bid
Moorhead, MN

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

Appaloosa Woods Area Street Reconstruction
Post-Bid
Maple Grove, MN

Phase 4 Street and Utility
Results
Minneapolis, MN

Grading, Aggregate Base, Bituminous Surfacing, Concrete Curb and Gutter, Concrete Walks, Water Main, Sanitary Sewer, and Related Restoration
Post-Bid
MN

Wastewater Stabilization Pond Expansion
Results
$3,000,000 est. value
Deer River, MN

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

Culvert Repair and Guardrail
Results

Last Updated 06/09/2022 02:55 AM
Project Title

Nemadji State Forest, Harlis State Forest Road Culvert Replacement

Physical Address View project details and contacts
City, State (County) Carlton, MN   (Carlton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Remove three culverts. 2. Install four Corrugated Metal Pipe (CMP) culverts. 3. Install one box culvert. 4. Repair ditch washout.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents