Similar Projects
PQ List for Demolition Services in CDBG
Post-Bid
Pittsburgh, PA 15219

CDBG Removal of Blighted Structures
Post-Bid
Berwick, PA 18603

Demolition and Site Clearing Project South Main
Demolition
Results
$10,000 to $40,000 est. value
Pittston, PA 18640

Schreiber Industrial Park Demolition of Building 238
Demolition
Results
New Kensington, PA

New Sandy Run Middle School Contract 1 General
New Construction, Demolition - 197,000 SF
Construction
Dresher, PA 19025

Penn Highlands East Wing Demolition
Demolition
Construction
DuBois, PA 15801

Emergency Demolition 39 North 18th Street
Post-Bid
Harrisburg, PA 17101

Demolition and Complete Removal of a 50X37 Garage
Demolition
Results
Wyalusing, PA

Southern Operations and Maintenance Facilities Improvements
New Construction, Addition, Demolition - 118,144 SF
Construction
PA

Murphy Building Demolition Project
Demolition
Post-Bid
Blairsville, PA 15717

Construction - Boiler Demo - Washington PA
Results
Less than $25,000 est. value
Washington, PA 15301

UST Removal and Soil Excavation at Lukoil Site # 69243
Renovation
Post-Bid
Glenside, PA 19038

Building Demolition - 3525 and 3515 Gettysburg Road
Demolition
Results
$25,000 est. value
Camp Hill, Lower Allen, PA 17011

2020 Monessen CDBG Demolition and Site Clearance Project - Phase I
Demolition
Post-Bid
Monessen, PA 15062

Residential Property Demolition
Demolition
Results
Curwensville, PA

Last Updated 05/03/2021 09:05 AM
Project Title

Demolition of Former Brookline Elementary School

Physical Address View project details and contacts
City, State (County) Havertown, PA 19083   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the following: 1. Identification, removal and legal disposal of interior and exterior window glazing and exterior caulk. 2. Coordination with the various utility companies for location and capping/severing of all utilities servicing the building at the location identified on the plans and/or indicated by the utility company. This includes but is not limited to: water, gas, electric, sanitary sewer and storm sewer. 3. Installation, maintenance and removal of all temporary controls. 4. Demolition of the building including the foundation and footings. 5. Legal disposal of all material. 6. Salvaging of a portion of the existing stone facade for Township re-use 7. Filling/grading of the foundation area and all other areas where walkways and paving were removed. 8. Seeding and stabilization of all disturbed areas. B. The building is a 2-story, approximately 33,000 square-foot masonry/ concrete/wood framed building.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents