Similar Projects
Last Updated | 08/12/2022 08:02 PM |
Project Title | Hazen High School - Domestic Water Entrance and Water Heater Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Renton, WA 98059 (King County) |
Category(s) | Education, Single Trades |
Sub-Category(s) | HVAC, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $255,137 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of Work: The Work, includes, but is not limited to: Demolition of existing boiler and locker room pressure reducing valves. Installation of new pressure reducing valve stations and relocation installation of existing reduced pressure backflow preventers. Demolition of existing steam-to-domestic hot water heat exchanger and hot water storage tank. Installation of new gas fired condensing water heating plant Right to Reject: The Owner reserves the right to accept the lowest or any other Quotation, the right to reject any or all Quotations, and the right to waive any irregularities in any Quotation. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |