Similar Projects
Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

Chapter Building 1
New Construction - 251,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Seattle, WA 98105

Chapter Building 1
New Construction - 251,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Seattle, WA 98105

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Public Storage
New Construction - 81,041 SF
Post-Bid
Kent, WA 98032

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Latona Station Apartments
New Construction - 194,500 SF
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98105

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

Fujimatsu Village
New Construction - 25,000 SF
Conception
Seattle, WA 98104

800 Stewart
New Construction - 702,349 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98101

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Last Updated 09/08/2022 02:14 PM
Project Title

Microsoft Electric Vehicle Charging and Maintenance Facility

Physical Address View project details and contacts
City, State (County) Redmond, WA 98053   (King County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Office, Parking Garage, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

the project scope includes a bus parking lot with an overhead charging system, a parking garage, a bus wash and maintenance facility and office space on 8 acres. Scope details have not been released. As of September 8, 2022 the project is in planning stage. A pre-application meeting was held in July 2022 with the City of Redmond. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the summer of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, Parking Spaces, 300 Parking Spaces. Parking Spaces, 225 Parking Spaces. 1 Story Above Grade, New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents