Similar Projects
Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

Police Training Facility - Berm Improvements
Construction
Less than $2,200,000 est. value
Conroe, TX 77301

Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Bass Lodge Retaining Wall Repair at Daingerfield State Park
Results
$136,600 est. value
Daingerfield, TX 75638

Sims Bayou Harvey Repairs, Harris County, Texas
Post-Bid
TX

Sabine River Authority Lake Tawakoni Spillway Channel Bank Stabilization
Results
$2,800,000 est. value
Wills Point, TX 75169

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Provide Super 2 Passing Lanes
Results
Less than $17,743,517 est. value
TX

Ford High School Drainage
Post-Bid
Quinlan, TX 75474

Construction of River Ranch Detention Pond A, B, and C
Results
Houston, TX

E Lantrip Channel Outfall Improvements
Post-Bid
$80,000 est. value
Kilgore, TX 75662

Jones Creek Slope Rehabilitation
Results
Less than $13,998,075 est. value
Houston, TX

Last Updated 07/08/2021 12:19 PM
Project Title

Construction of 281 South Commercial Park Subdivision Improvements

Physical Address View project details and contacts
City, State (County) Burnet, TX   (Burnet County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,191,980
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. 1,007 linear feet of 36 feet wide commercial street; 2. 1,812 linear feet of concrete curb and gutter; 3. 97 linear feet of ribbon curb; 4. 209 linear feet of 2 each - 5’ x 5’ multiple box culverts; 5. 554 linear feet of 24 and 30 inch RCP storm pipe; 6. 1,179 linear feet of earthen and concrete channels; 7. 2,133 linear feet of 12 inch water main; 8. 497 linear feet of 8 and 12 inch wastewater main; and 9. Temporary and Permanent Erosion and Traffic Control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents