Similar Projects
SRF - Secondary Clarifiers Improvements - City of East Lansing
Renovation, Alteration
Conception
$21,000,000 est. value
East Lansing, MI 48823

Oakwood and East Glencairn Phase 2 - City of East Lansing
Infrastructure
Conception
$1,789,715 est. value
East Lansing, MI 48823

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

Meridian Company Industrial Building
New Construction, Infrastructure - 31,355 SF
Design
$16,000,000 CJ est. value
East Lansing, MI 48823

Steam Line Replacement at the Elliott-Larsen Building
Infrastructure, Renovation
Bidding
$1,347,900 CJ est. value
Lansing, MI 48933

Steam Line Replacement at the Elliott-Larsen Building
Infrastructure, Renovation
Bidding
$1,347,900 CJ est. value
Lansing, MI 48933

Demolition of 1 Property Regent St
Demolition, Infrastructure
Sub-Bidding
$15,000 CJ est. value
Lansing, MI 48912

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wexford Montessori Site Improvements
Infrastructure
Post-Bid
Lansing, MI 48911

North Elementary Site Improvements
Infrastructure
Results
Lansing, MI 48911

2021 Burcham Drive and Grove Street Alley Water Valve Replacements and New Valves
Term Contract, Infrastructure
Results
$700,000 est. value
East Lansing, MI 48823

Neogen Shiawassee Street Manufacturing Plant
New Construction, Infrastructure - 175,000 SF
Pending Verification
$70,000,000 CJ est. value
Lansing, MI 48912

Building Replacement 1 - 2022 Bond - Lansing School District
New Construction, Infrastructure
Pending Verification
$21,900,000 CJ est. value
Lansing, MI 48933

SRF Rivers Waters Edge District Improvements - City of East Lansing
Infrastructure
Conception
$10,200,000 est. value
East Lansing, MI 48823

City View Lansing Apartments
New Construction, Infrastructure - 3,500 SF
Design
$25,000,000 CJ est. value
Lansing, MI 48933

Last Updated 02/03/2023 05:07 PM
Project Title

Truck Bay Drain Troughs Repair and Construction

Physical Address View project details and contacts
City, State (County) Lansing, MI 48912   (Ingham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall include all material, services, labor and supervisory personnel required to construct and deliver a complete package as indicated on the drawings and described below. There may be other contractors or BWL staff in and near the work area. Contractor shall work cooperatively with others to execute the work and not hinder BWL operations. The project site is 148 S. Cedar Street, Lansing, Michigan 48912. A Confidentiality Agreement and Scope of Work is attached for the RFP - Truck Bay Drain Troughs Repair and Construction. A separate posting has been created for the RFP. You must sign and return the Confidentiality Agreement attached to this posting to be invited to the RFP. Please sign and return the Confidentiality Agreement to Tad Miller via email at Tad.Miller@lbwl.com. The BWL was founded in 1885 and is the largest municipally owned electric utility in Michigan and among the 30 largest in the United States. An eight-member Board of Commissioners appointed by the mayor and confirmed by the Lansing City Council governs the BWL. The BWL employs a total of approximately 725 bargaining and non-bargaining employees. The bargaining unit employees are represented by the International Brotherhood of Electrical workers (IBEW) local 352. The BWL owns and operates: (a) an electric system, which generates, purchases and distributes electric power and energy, and provides electric service to over 99,000 residential, commercial, and industrial customers in the greater Lansing, Michigan area, and wholesale customers through participation in the Midcontinent Independent System Operator, Inc. (MISO), which is BWL's regional electric grid.; (b) water wells, a raw water transmission system, water conditioning facilities, and an extensive water distribution system serving potable water to over 57,000 residential, commercial, and industrial customers in the greater Lansing area; (c) steam generation boilers, a steam transmission and distribution system serving approximately 151 customers, and a chilled water facility and distribution piping system serving 19 customers in the city of Lansing. The BWL's total operating revenue for fiscal year 2022 was $397,149,164.00. The Work must adhere to the following Scope of Work. 1. Work By Contractor The Work shall include all material, services, labor, and supervisory personnel required to complete the Work as indicated on the Drawings and as described below. The Work includes but is not limited to the following items: a. Prepare project submittals and mobilize to site b. Comply with BWL's contractor safety policies including attending site orientation(s) c. Coordinate work and cooperate with others d. Maintain one open bay at all times. Coordinate bay closures with area supervisor minimum 72 hours prior to shutting down the area. e. Clean out the existing trench drain and work area before beginning of the construction.f. Due to operational needs, the access to the project site is not available between 5 am to 10 am. All work needs to start after 10 am in the morning. g. Install protective fencing, barricades, lanterns, etc. as necessary to demark the construction area h. Replace existing trench frame and grate covers for areas shown on the drawing with East Jordan (EJ)- Heavy Duty (H2O rated) Bolted, Type A trench grate and angle-style frame series. i. Fabricate and install trench-crossing grating support section as detailed in drawings j. Perform concrete restoration in the vicinity of the grating replacement and form the trench where needed to match the existing. Provide square, saw-cut edges as described in drawings along perimeter of concrete demolition area. k. Salvage intact grating sections for reuse by Owner at other parts of the facility l. Maintain a clean and safe work environment. Routinely remove debris and organize equipment so as to maintain a work area in a clean and tidy condition m. Remove construction debris, broken angle grating and broken grate covers, load, haul and dispose offsite in accordance with applicable regulations n. Remove all tools, equipment, barricades, signs, etc. and demobilize after final walkthrough and cleanup o. Miscellaneous items not specifically indicated but required for completion of the work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents