Similar Projects
MDS 5th Floor Early Equipment Release
Term Contract
Sub-Bidding
$430,000 CJ est. value
Lexington, KY 40508

Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

Custom Air Handling Unit
Renovation
Post-Bid
$800,000 CJ est. value
Lexington, KY 40508

PAV WH Replace AHU 4 and 5 - 2553.0
Infrastructure
Results
$1,425,000 est. value
Lexington, KY

Blue Grass Airport - Boiler Room 1 - Chiller Replacement - 2112
Alteration
Results
$275,000 est. value
Lexington, KY

Construction to Upgrade Chiller Plant
Renovation
Post-Bid
$5,000,000 CJ est. value
Lexington, KY 40511

Fine Arts Building Elevator Modernization
Renovation
Results
Lexington, KY 40508

HVAC Repair
Term Contract
Post-Bid
Lexington, KY 40508

Repair/Upgrade/Expand Central Plant - Deaerators Phase 1
Renovation, Infrastructure
Results
$250,000 est. value
Lexington, KY 40502

Whitaker Family YMCA Swimming Pool HVAC Replacement
Build-out
Post-Bid
$1,500,000 CJ est. value
Lexington, KY 40509

Phi Gamma Delta Chiller Project
Renovation
Results
$247,800 CJ est. value
Lexington, KY 40508

Chemistry Physics Building - Heat Exchange
Renovation
Post-Bid
Lexington, KY 40508

Cooling Plant #1 Tower Replacement Phase 4
Renovation
Results
$1,435,000 CJ est. value
Lexington, KY 40508

HVAC York Fan Boxes
Term Contract
Post-Bid
Lexington, KY 40510

PSOC Server Room Cooling Replacement
Renovation
Results
$426,400 CJ est. value
Lexington, KY 40504

Last Updated 05/16/2023 10:06 AM
Project Title

PAV A. Data Center Redundant Glycol Loop

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $19,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed proposals for the following work will be received by the University of Kentucky, Construction Procurement Section, Peterson Service Building, 411 South Limestone, Lexington, Kentucky 40506-0005, in the manner and on the date hereinafter specified for the furnishing of all labor, materials, supplies, tools, appliances, equipment, services, etc., necessary for the construction of PROJECT: PAV A. Data Center Redundant Glycol Loop, as set forth in the specifications and as shown on the drawings for as prepared by UKPlanning, Design and Construction Services and approved by the Construction Procurement Section and under the terms and conditions of this Invitation. Contractor will be responsible for material, labor, coordination and management to install a redundant loop for the Glycol System feeding the existing PAV A Data Center. Bids will be received from Prime Contractors on a Lump Sum Amount for the total project. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner herein described and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Bids shall be submitted only on the Official Forms supplied by the University of Kentucky, Construction Procurement Section. Failure to comply with the foregoing requirements will be cause for invalidation of bid. Note: Responses to Written Questions received no later than 04/20/2023 will be provided in an addendum issued on or about 04/27/2023. Final award of Contract will be made on the basis of the lowest, responsive and responsible bid which offers the best value. Anyone wishing to discuss specific items is requested to submit the items in writing to Capital Construction Procurement, no later than 04/20/2023 at 1:00 PM Lexington, KY Time. Written questions can be submitted by email to Ken Scott at cckbidquestions@uky.edu or fax to 859.257.1951. The time for substantial completion for all phases shall be one hundred eighty (180) consecutive calendar days and Final Completion shall be thirty (30) consecutive calendar days thereafter. Substantial Completion will include all site restoration completed, site cleanup and fully functional. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions Payments for Plans, Specifications and Official Bid Documents must be made to Lynn Imaging before a set of documents will be issued. Notes: Contractors that receive plans and specifications from other sources than Lynn Imaging must request a "Form of Proposal" from the University's Purchasing Representative to be registered as plan holders and to receive addendums. Potential Contractors must identify the position of their firm as a prime bidder, miscellaneous subcontractor, material supplier or other when ordering of picking up Plans and Specifications. Bids, upon their receipt by the University of Kentucky, Construction Procurement Section are stamped showing the hour and date received. Bids received after the scheduled closing time for reception of bids will not be considered provided legal and accepted bids have been received on said referenced Invitation. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. For assistance in identifying diverse businesses and contractors please contact Marilyn Clark, Supplier Diversity Manager, University of Kentucky at mcl256@uky.edu The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Bidders wishing to submit a request for consideration of an alternate under the provisions of Article 48.3 of the General Conditions to the Contract to any article, device, equipment, product, material, fixture, patented process, form, method or type of construction, or by name, make, trade name, or catalog number shall submit a written request to the University at least 14 calendar days prior to the official bid date of the Project including all necessary information and sufficient detail to allow evaluation by the Consultant and the University and, if the University determines the alternate is acceptable, an addendum will be issued allowing the change and advising all bidders of the option. If no addendum is issued to allow the requested change, the Bidder shall assume the request is not approved and shall prepare the bid on that basis. The apparent low bidder will be requested to meet with the Construction Manager to review the bid and scope of services. The time and place of this meeting will be announced at the bid opening

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents