Similar Projects
2021 HMAC Hot In-Place Recycling
Infrastructure
Post-Bid
Longview, TX

2022 Chip Seal
Infrastructure
Post-Bid
$1,200,000 est. value
Longview, TX

Joe Burl Lane Pavement Rehabilitation
Results
Lakeport, TX 75603

Loop 281 and Nealy Way Intersection Improvements
Results
$403,930 est. value
Longview, TX

2021 Chip Seal
Results
Less than $1,300,000 est. value
Longview, TX

Hot Mix
Results
$276,000 est. value
TX

2020 Seal Coat Program
Results
Longview, TX 75603

2021 Group Seal Coat Program
Results

Fairmont Street Reconstruction Project
Results
$4,739,233 est. value
Longview, TX 75608

US 259 - Seal Coat
Results
$1,820,471 est. value
TX

2021 Street Overlay
Infrastructure
Results
$175,000 est. value
Longview, TX

High Street and Mobberly Avenue Intersection Improvements
Infrastructure
Results
$2,850,000 est. value
Longview, TX 75602

Street Improvements, Phase 2
Infrastructure
Results
$85,000 to $95,000 est. value
Lakeport, TX 75603

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

2021 CDBG Water, Sewer, Drainage, and Street Improvements - Joaquin Court
Infrastructure
Results
$224,000 est. value
Longview, TX 75604

Last Updated 05/30/2022 02:18 AM
Project Title

SH 135 - Surfacing/Roadway Restoration

Physical Address View project details and contacts
City, State (County) TX   (Gregg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,294,730
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6001 Preparing Row Ac 0.220 1 104 6001 Removing Conc (Pav) Sy 20,246.000 2 104 6011 Removing Conc (Medians) Sy 434.000 3 104 6015 Removing Conc (Sidewalks) Sy 137.000 4 104 6017 Removing Conc (Driveways) Sy 3,697.000 5 104 6022 Removing Conc (Curb And Gutter) Lf 7,579.000 6 104 6026 Remove Conc (Gutter) Lf 5,113.000 7 105 6039 Remove Stab Base And Asph Pav (6"-20") Sy 11,024.000 8 110 6001 Excavation (Roadway) Cy 19,310.000 9 132 6005 Embankment (Final)(Ord Comp)(Ty c) Cy 192.000 10 158 6003 Spec Excav Work (Hyd Excavator) Hr 50.000 11 160 6003 Furnishing And Placing Topsoil (4") Sy 1,222.000 12 164 6009 Broadcast Seed (Temp) (Warm) Sy 1,822.000 13 164 6054 Bond Fbr Mtrx Seed (Perm)(Rural)(Sand) Sy 1,822.000 14 260 6004 Lime (Quicklime (Dry)) Ton 442.000 15 260 6073 Lime Trt (Subgrade)(8") Sy 18,428.000 16 275 6001 Cement Ton 277.000 17 275 6010 Cement Treat (Subgrade) (8") Sy 18,428.000 18 360 6018 Conc Pvmt (Jointed - Cpcd) (8") Sy 362.000 19 360 6020 Conc Pvmt (Jointed - Cpcd) (10") Sy 23,995.000 20 360 6022 Conc Pvmt (Jointed - Cpcd) (12") Sy 4,086.000 21 360 6067 Conc Pvmt (Jointed-Cpcd)(Hes)(10") Sy 7,252.000 22 360 6083 Conc Pvmt (Jc) (Transition Slab) Sy 120.000 23 400 6005 Cem Stabil Bkfl Cy 1,200.000 24 400 6007 Cut & Restore Conc Paving Sy 56.000 25 400 6008 Cut & Restore Asph Paving Sy 518.000 26 402 6001 Trench Excavation Protection Lf 3,449.000 27 416 6029 Drill Shaft (Rdwy Ill Pole) (30 In) Lf 200.000 28 420 6071 Cl c Conc (Collar) Ea 6.000 29 432 6022 Riprap (Stone Common)(Dry)(6 In) Cy 1.000 30 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 2,015.000 31 464 6006 Rc Pipe (Cl Iii)(27 In) Lf 35.000 32 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 131.000 33 464 6008 Rc Pipe (Cl Iii)(36 In) Lf 479.000 34 464 6009 Rc Pipe (Cl Iii)(42 In) Lf 1,856.000 35 464 6010 Rc Pipe (Cl Iii)(48 In) Lf 303.000 36 465 6006 Jctbox(Compl)(Pjb)(4ftx4ft) Ea 1.000 37 465 6010 Jctbox(Compl)(Pjb)(5ftx6ft) Ea 1.000 38 465 6011 Jctbox(Compl)(Pjb)(6ftx6ft) Ea 2.000 39 465 6021 Inlet (Compl)(Pco)(5ft)(None) Ea 4.000 40 465 6022 Inlet (Compl)(Pco)(5ft)(Left) Ea 10.000 41 465 6023 Inlet (Compl)(Pco)(5ft)(Right) Ea 10.000 42 465 6024 Inlet (Compl)(Pco)(5ft)(Both) Ea 17.000 43 465 6149 Inlet (Compl)(Pazd)(Sl)(3ftx3ft) Ea 2.000 44 465 6158 Inlet(Compl)(Pazd)(Fg)(3ftx3ft-3ftx3ft) Ea 1.000 45 465 6173 Manh (Compl)(Ty a) Ea 2.000 46 465 6341 Inlet (Compl) (Ext) (Ty Ci) Ea 9.000 47 467 6006 Set (Ty i) (24 In) (4: 1) (c) Ea 1.000 48 496 6002 Remov Str (Inlet) Ea 32.000 49 496 6007 Remov Str (Pipe) Lf 1,820.000 50 500 6001 Mobilization Ls 1.000 51 502 6001 Barricades, Signs And Traffic Handling Mo 18.000 52 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 200.000 53 506 6011 Rock Filter Dams (Remove) Lf 200.000 54 506 6020 Construction Exits (Install) (Ty 1) Sy 200.000 55 506 6024 Construction Exits (Remove) Sy 200.000 56 506 6029 Earthwork (Erosn & Sedmt Cont, In Veh) Cy 200.000 57 506 6038 Temp Sedmt Cont Fence (Install) Lf 300.000 58 506 6039 Temp Sedmt Cont Fence (Remove) Lf 300.000 59 506 6040 Biodeg Erosn Cont Logs (Instl) (8") Lf 1,000.000 60 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,000.000 61 508 6001 Constructing Detours Sy 2,210.000 62 512 6021 Port Ctb (Des Source)(Low Prof)(Ty 1) Lf 1,320.000 63 512 6022 Port Ctb (Des Source)(Low Prof)(Ty 2) Lf 360.000 64 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 2,920.000 65 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 380.000 66 512 6045 Port Ctb (Stkpl)(Low Prof)(Ty 1) Lf 1,320.000 67 512 6046 Port Ctb (Stkpl)(Low Prof)(Ty 2) Lf 360.000 68 529 6001 Conc Curb (Ty i) Lf 368.000 69 529 6005 Conc Curb (Mono) (Ty Ii) Lf 6,888.000 70 530 6017 Driveways (Conc) (Hes) Sy 6,382.000 71 536 6002 Conc Median Sy 1,627.000 72 545 6012 Crash Cush Atten (Instl)(r)(n)(Tl2) Ea 2.000 73 556 6008 Pipe Underdrains (Ty 8) (6") Lf 327.000 74 610 6288 In Rd Il (Ty Sa) 50t-10 (400w Eq) Led Ea 20.000 75 618 6023 Condt (Pvc) (Sch 40) (2") Lf 1,795.000 76 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 325.000 77 620 6007 Elec Condr (No.8) Bare Lf 2,270.000 78 620 6008 Elec Condr (No.8) Insulated Lf 5,520.000 79 624 6010 Ground Box Ty d (162922)w/Apron Ea 10.000 80 628 6298 Elc Srv Ty t 120/240 000(Ns)Gs(l)Sp(o) Ea 5.000 81 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 34.000 82 644 6076 Remove Sm Rd Sn Sup&Am Ea 16.000 83 662 6048 Wk Zn Pav Mrk Remov (Refl) Ty i-c Ea 429.000 84 662 6050 Wk Zn Pav Mrk Remov (Refl) Ty Ii-a-a Ea 340.000 85 662 6056 Wk Zn Pav Mrk Remov (Traf Btn) Ty w Ea 1,285.000 86 662 6058 Wk Zn Pav Mrk Remov (Traf Btn) Ty y Ea 1,018.000 87 662 6061 Wk Zn Pav Mrk Remov (w)4"(Dot) Lf 261.000 88 662 6063 Wk Zn Pav Mrk Remov (w)4"(Sld) Lf 5,313.000 89 662 6071 Wk Zn Pav Mrk Remov (w)8"(Sld) Lf 1,880.000 90 662 6075 Wk Zn Pav Mrk Remov (w)24"(Sld) Lf 56.000 91 662 6092 Wk Zn Pav Mrk Remov (w)36"(Yld Tri) Ea 59.000 92 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 5,771.000 93 666 6006 Refl Pav Mrk Ty i (w)4"(Dot)(100mil) Lf 191.000 94 666 6042 Refl Pav Mrk Ty i (w)12"(Sld)(100mil) Lf 82.000 95 666 6102 Ref Pav Mrk Ty i(w)36"(Yld Tri)(100mil) Ea 38.000 96 666 6147 Refl Pav Mrk Ty i (y)24"(Sld)(100mil) Lf 330.000 97 666 6224 Pavement Sealer 4" Lf 8,898.000 98 666 6237 Pavement Sealer (Lndp Arrow) Ea 2.000 99 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 396.000 100 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 2,493.000 101 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 10,450.000 102 668 6083 Prefab Pav Mrk Ty c (w) (Lndp Arrow) Ea 2.000 103 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 182.000 104 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 21.000 105 678 6001 Pav Surf Prep For Mrk (4") Lf 8,898.000 106 678 6009 Pav Surf Prep For Mrk (Arrow) Ea 2.000 107 3076 6040 d-Gr Hma Ty-d Pg70-22 Ton 139.000 108 3077 6011 Sp Mixes Sp-c Pg64-22 Ton 6,299.000 109 6001 6001 Portable Changeable Message Sign Day 598.000 110 6185 6002 Tma (Stationary) Day 431.000 111 6185 6005 Tma (Mobile Operation) Day 431.000 112

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents