Similar Projects
M & M Indoor Mini-Golf
Build-Out, Alteration - 8,400 SF
Design
Arlington Heights, IL 60004

Naperbrook Golf Course Practice Area and Springbrook Golf Course - Phase 1
Renovation
Post-Bid
Naperville, IL

Deerpath Golf Course Restoration
Renovation
Post-Bid
Lake Forest, IL 60045

Clark Park Disc Golf Improvements
Results
Elk Grove Village, IL

Prairie Landing Golf Club Locker Room
Renovation
Results
West Chicago, IL 60185

Heritage Bluffs Golf Course Clubhouse
Post-Bid
Channahon, IL 60410

Harrison Park Golf Course Building Exterior Improvements
Renovation
Results
Danville, IL

Steeple Chase Maintenance Yard
Infrastructure
Post-Bid
Mundelein, IL 60060

Springbrook Golf Course 2022
Renovation
Results
Naperville, IL 60564

Golf Course Management
Term Contract, Infrastructure
Post-Bid
Danville, IL

Arboretum Golf Course Patio Upgrades
Renovation
Results
Buffalo Grove, IL 60089

Phillips Park Golf Course Master Plan
Infrastructure
Post-Bid
Aurora, IL

2022 Sunset Valley Golf Club Cart Path Bridge Replacement and Removal
Infrastructure
Results
Highland Park, IL 60035

Walnut Greens Golf Course Redevelopment
Renovation, Infrastructure
Post-Bid
Schaumburg, IL 60194

Lake of the Woods Golf Course Irrigation Head Replacement
Alteration
Results
$38,000 est. value
Mahomet, IL 61853

Last Updated 05/26/2022 12:50 AM
Project Title

Bunker Renovations at Atwood and Ledges Golf Course

Physical Address View project details and contacts
City, State (County) Rockford, IL 61103   (Winnebago County)
Category(s) Entertainment/Recreation
Sub-Category(s) Golf Course
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work described in these specifications represents the minimum requirement for bunker renovation. Contractor must have previous bunker renovation experience. • Excavation of existing bunkers sand & soil • Placement and shaping of topsoil • Installation of 4” drain tile and output to daylight on each. • Delivery, placement and shaping of new bunker and placement of Better Billy bunker liner. • Delivery, placement and shaping of bunker sand as per Better Billy Bunker Specifications • Delivery and installation of 1800 sq. ft. of sod around each new bunker parameter

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents