Similar Projects
Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

2020 Street Maintenance and Repair Project
Post-Bid
Grantsville, UT

Redwood Road 4100 South to 5400 South
Results

Guardrail and Crash Cushion Repairs R2 Area
Term Contract
Results

Moenave Trail Improvements
Post-Bid

Elton Park Sidewalk Project
Results
Less than $60,000 est. value
Tooele, UT 84074

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Post-Bid
Less than $3,308,642 est. value

I-80; MP 70 to 80 Preservation High Volume
Results
$4,000,000 to $6,000,000 est. value
UT

2021 Roadway Slurry Seal Project
Post-Bid
Tooele, UT

I-80; WB MP 99.15 - 106.00 Choke Point
Results
$4,000,000 to $6,000,000 est. value

Zone 1E - Irrigation Pond
Post-Bid
Bluffdale, UT

2020 Roadway Improvement Project
Results
Less than $600,000 est. value
Tooele, UT 84074

2020 Concrete Waterway Project
Results
$150,000 to $200,000 est. value
Tooele, UT 84074

SR-138; I-80 to Grantsville
Results
$3,000,000 to $4,000,000 est. value
Grantsville, UT 84029

Grantsville West Durfee Sidewalk
Results
Less than $500,000 est. value
Grantsville, UT 84029

Last Updated 04/27/2020 10:17 AM
Project Title

East 8th Street Improvements and Pine Avenue Connection

Physical Address View project details and contacts
City, State (County) Arinosa, UT 85546   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: This project includes the rubblization of existing concrete pavement, and removal of existing sidewalk on East 8th Street between US HWY 191 and US HWY 70, with new construction of East 8th Street between US HWY 191 and US HWY 70 and the Pine Avenue Extension to 7th Street. All street construction consists of new curb and gutter, sidewalk, drainage, and A.C. pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents