Similar Projects
Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Rehabilitation General Aviation Apron - Phase 1 - 413020 - City of St.Joseph
Infrastructure
Conception
$5,000,000 est. value
Saint Joseph, MO 64504

Hillyard Technical Center - 2022 Facility Addition
Addition, Demolition, Infrastructure - 22,262 SF
Bidding
$3,000,000 CJ est. value
Saint Joseph, MO 64506

Stage 7B Liner Construction
Infrastructure
Bidding
$300,000 CJ est. value
Saint Joseph, MO 64507

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Resurface on US 36 From Caldwell County
Infrastructure
Results
$7,500,000 to $10,000,000 est. value

Resurface
Infrastructure
Results
$5,000,000 to $7,500,000 est. value

Hyde Park Cable-Stay Bridge - 2020 General Obligation Bond - City of St. Joseph
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Hyde Park Cable-Stay Bridge - 2020 General Obligation Bond - City of St. Joseph
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Northside Complex Splash Park - 250696 - City of Saint Joseph
Infrastructure
Conception
$2,000,000 CJ est. value
Saint Joseph, MO 64501

2023 Resurfacing Program
Infrastructure
Bidding
$300,000 CJ est. value
Saint Joseph, MO 64501

Cross Country Track Dirt Work
Infrastructure
Post-Bid
Saint Joseph, MO 64507

Resurfacing Program 2022
Infrastructure
Results
MO

Rosecrans Memorial Airport Air Traffic Control Tower - City of St. Joseph
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
Washington Township, MO 64503

Last Updated 02/08/2023 04:34 PM
Project Title

Rosecrans Memorial Airport Runway- City of St. Joseph

Physical Address View project details and contacts
City, State (County) Washington Township, MO 64503   (Buchanan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $42,000,000 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Runway Construction: Phase One The first phase will close the most southern part of the main runway, 17/35, which runs north to south. This will make the runway shorter, but aircraft will still be able to take off and land. The runway lights will not be on since the runway will be shorter than normal. Runway construction in phase one is expected to wrap by May 18. Runway Construction: Phase Two This second phase will close the majority of the main runway, 17/35. The National Guard will be able to use the southern tip of the runway including its C-130 apron parking. The second runway, named 13/31, will be reopened. Runway lights will be on for this runway. This phase is planned for May 19-Sept. 15. Runway Construction: Phase Three The final phase of the runway construction is expected to take place Oct. 15- Nov. 3. The month break before this phase will allow the new cement to set before construction grooves the runway. As of February 2023, the project bid and an apparent low bidder has been announced. Construction timeline begins in March of 2023.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents