Similar Projects
Fulmer Road Collection System Extension
New Construction
Bidding
$2,270,000 est. value
PA

Rodeway Inn Pump Station Replacement Project
New Construction
Bidding
Bedford, PA

Shiloh Pump Station Materials
Post-Bid
State College, PA 16801

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Commercial Iron Shop and In-Field Services at Transfer Stations 1 & 3
Renovation
Results
Chester, PA

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

Wastewater Treatment Plant Project - General/Process Mechanical
New Construction, Alteration
Bidding
$7,225,000 est. value
Reinholds, PA

Jeannette Sewage Treatment Plant Pump Station Upgrade General / Mechanical Construction
Post-Bid
New Stanton, PA 15672

Pump Station Replacements - Clark and Walton Streets Project
Results
Less than $250,000 est. value
Lemoyne, PA 17043

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Rich Hill Road Pump Station Dimminutor Addition
Addition, Infrastructure
Bidding
Russellton, PA 15024

Tanker Filling Station
Post-Bid
Renovo, PA

Pump Station No.1 Interceptor Sewer Lining and Manhole Repair Project
Results
$151,901 est. value
Carlisle, PA 17013

Last Updated 01/12/2022 10:24 AM
Project Title

Sanitary Sewer Pump Station No. 1

Physical Address View project details and contacts
City, State (County) PA   (Luzerne County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal of two (2) existing 140 HP pump and the installation of two (2) new 130 HP dry submersible non-clog pump and appurtenances in the existing sub-basement at Pump Station No. 1.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents