Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 3 and 4
Post-Bid
Atlanta, Dahlonega, Dunwoody, Hampton, Irondale, Jonesboro, LaFayette, Riverdale, Roswell, GA 30525

Southern Region Disaster Recovery Support BPA
Results

Veterans Parkway at SR 92 - Signalization
Results
GA

2021 LMIG Project
Post-Bid
Mount Vernon, GA

Concrete Parking Lot for Warehouse 2 Finishing
Results
Fayetteville, GA 30215

Driveway and Curb Repair
Post-Bid
GA

Peachtree City Paving Projects for 2020
Results
Peachtree City, GA 30269

Tyrone Road Resurfacing
Post-Bid
Fayetteville, GA

Medlock Bridge at Bush Road Intersection Improvements
Results
Peachtree City, GA 30092

Paving Projects for Fayette County Public Schools
Post-Bid
Fayetteville, Tyrone, GA 30290

2020 Asphalt Resurfacing
Results
Tyrone, GA

T32-D3-Pavementpreservation-CS-Area 5 - 101894
Results

Fayette County Resurfacing Program - FY 2019
Term Contract
Results
GA

Asphalt for Central Office Parking Lot
Results
Less than $15,750 est. value
Fayetteville, GA 30214

Last Updated 05/06/2021 09:41 AM
Project Title

Redwine and Starrs Mill School Complex Multi-Use Path

Physical Address View project details and contacts
City, State (County) Woolsey, GA 30214   (Fayette County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to construct a 10-ft wide (typical) asphalt path along the eastern side of Redwine Road. The path will be used by pedestrians, bicycles, golf carts, etc. and will connect with existing path segments and cross several intersecting side streets. The project also includes construction and installation of a pedestrian hybrid beacon at proposed Redwine Road crosswalk

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents