Similar Projects
SP Crossing Apartments
New Construction - 70,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Commerce City, CO 80022

Cherry Creek West Mixed-Use Development
New Construction
Conception
Denver, CO 80238

1900 Lawrence Office Building
New Construction - 720,000 SF
Design
$400,000,000 est. value
Denver, CO 80202

Butterfly Pavilion At Baseline
New Construction, Infrastructure - 81,000 SF
Design
$55,000,000 CJ est. value
Westminster, CO 80030

RFP Contractor - Thornton Police Department Shooting Range
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Thornton, CO 80229

Service Street Auto Repair / Broomfield - Rebid
New Construction, Infrastructure - 4,556 SF
Bidding
$1,700,000 CJ est. value
Broomfield, CO 80020

Parterre
New Construction
Post-Bid
Thornton, CO 80602

Quebec Highlands Infrastructure
Infrastructure
Post-Bid
Thornton, CO 80602

Reunion Village 8 Filing 1 District Improvements
Infrastructure
Results
Commerce City, CO

Construction Management/General Contractor (CM/GC) Services
New Construction
Results
Aurora, CO 80010

Aspire Aprtments
New Construction - 93,283 SF
Construction
$61,000,000 est. value
Westminster, CO 80031

Heritage at Church Ranch
New Construction - 264,953 SF
Construction
Westminster, CO 80021

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Denver7 Building Apartment Renovation
New Construction, Renovation - 15,000 SF
Conception
$35,000,000 est. value
Denver, CO 80203

Last Updated 02/22/2023 09:36 AM
Project Title

Griffith Twelve

Physical Address View project details and contacts
City, State (County) Georgetown, CO 80444   (Clear Creek County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The plan will be presented to the Georgetown Design Review commission February 23, 2023. Architect or contractor have been selected. A firm construction timeline has not been set, however construction is not expected to begin prior to mid 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents