Similar Projects
Shotcrete and Restorative Services for Stormwater Projects
Term Contract
Bidding
GA

CCCP Pipe Lining
Infrastructure
Bidding
$285,000 est. value
Peachtree City, GA

Dewater Quarry
Post-Bid
Auburn, GA 30011

Construct and Repair Outfall 9 Culvert at Poorhouse Creek and Windy Hill Road
Post-Bid
Marietta, GA 30069

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Sewer Extension to V.D. Parrott WTP Project
Results
Dalton, GA 30719

Fort Gaines FY2020 CDBG
Infrastructure
Bidding
Fort Gaines, GA

Storm Drainage and Street Improvements Phase III
Post-Bid
Bronwood, GA

Church Street Stormwater Improvements CDBG
Results
Less than $204,555 est. value
Buford, GA 30518

Lil Jess Lane Stormwater Improvement Project
Infrastructure
Bidding
GA

Sewer System Evaluation Surveys
Post-Bid
Lake City, GA 30260

Fairways Drive Stormwater Improvement Project
Results
Douglasville, GA 30134

Frames, Grates, Covers, Inlets - Annual Contract
Term Contract
Bidding
Columbus, GA

On-Call Stormwater Infrastructure Response Installation and Repair Services
Term Contract
Post-Bid
Chamblee, GA 30341

821 Tanglewood Trail Stormwater Improvement
Results
Sandy Springs, GA

Last Updated 11/09/2021 04:44 PM
Project Title

Laurel Springs Gravity Sewer Upgrade

Physical Address View project details and contacts
City, State (County) GA   (Forsyth County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered under this contract consists of installing approximately 3,000 feet of pipe bursting with 18-inch HDPE, 230 feet of 18-inch remove and replace in the same trench, and 1,500 feet of open cut with 18” DIP. The project include sewer by-pass pumping, seven new precast manholes, golf course access and restoration, and erosion and sediment control.

Details

Division 02 - Existing Conditions.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents