Similar Projects
Heat Pump Replacements at John Griffin Middle School
Bidding
Fayetteville, NC 28304

Heat Pump Replacements at MAC Williams Middle School
Bidding
Fayetteville, NC 28312

Water Supply Well #28
Post-Bid
Aberdeen, NC 28315

Bypass Pumping Service
Post-Bid
Charlotte, NC

Monitoring Well Installation at Merchants Millpond State Park
Results
NC

Dixon Well Sites D10 and D11 Phase 2
Results
Holly Ridge, NC

New Raw Water Main and Well Enclosure
Bidding
Newport, NC 28570

2016 Water System Improvements, Contract No. 14 - Well No. 65-CH and Well No. 66-PD
Post-Bid
Washington, NC

East Lake Operations Center Water Treatment Upgrade
Results
Less than $25,000 est. value
East Lake, NC

Test and Production Wells 3 and 4
Bidding
Lake Waccamaw, NC 28450

Dewatering Pump Rental
Term Contract
Post-Bid
Raleigh, NC

Saline Well Repair With Pump Replacement - Edenton NFH, NC
Results
Edenton, NC

River Pump Motor, Removal and Installation
Bidding
Halifax, NC 27887

Floodwater Dewatering Pump Rental and Operations
Term Contract
Post-Bid
Nags Head, NC

Refurbishment of a Rail Tank Car Training Prop
Term Contract
Results
Lumberton, NC

Last Updated 08/30/2019 09:41 AM
Project Title

Construct Tanker Truck Delivery System

Physical Address View project details and contacts
City, State (County) Goldsboro, NC   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Provide a tanker truck fuel delivery system capable of simultaneous receipt and delivery. System will be capable of receiving 1,600 Gallons Per Minute (GPM) while simultaneously issuing 2,400 GPM of jet fuel. Construct truck unloading and load stand facilities, four unload drop tanks with 400 gallonper minute pumps and secondary containment, a pump house with simultaneous issue and transfer capabilities, fuel piping, and refueler truck parking area. Provide utilities, storm sewer, pavement, access roads, area lighting, emergency generator, cathodic protection, leak detection, fire protection, communications, site preparation and improvements, canopies for drop tanks and fill stands. Demolish existing pump house, truck offload points, co-located fill stands, and associated fuel lines.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents