Similar Projects
Enhance Pedestrian and Bike Facilities along Main Street - Town of Clifton Park
Infrastructure
Conception
$1,781,000 est. value
Clifton Park, NY

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Sealcoating and Striping Parking Lots
Infrastructure
Bidding
$300,000 est. value
Greenfield Center, Middle Grove, Saratoga Springs, NY 12850

Paving of Certain Village Streets
Post-Bid
Waterford, NY

Sealcoating/Crack Sealing/Striping 2021
Infrastructure
Post-Bid
Stillwater, NY

Old Post Road and Route 9 Intersection Improvement Project
Results
Malta, NY

Hudson-Mohawk Trail Resurfacing Improvements
Infrastructure
Results
$765,300 to $1,035,400 est. value
Saratoga Springs, NY

Common Seal and Strip
Infrastructure
Bidding
$200,000 est. value
NY

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Crack Seal/Mastic
Infrastructure
Results
Clifton Park, NY

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Adirondack Day Hab Parking Lot Repave and Restripe with Lighting Upgrade
Infrastructure
Results
$750,000 to $775,000 est. value
Corinth, NY 12822

Administration Mortar Joint Repairs
Infrastructure
Post-Bid
$100,000 est. value
Saratoga Springs, NY 12866

Pavement Resurfacing, I-87 From Exit 15 to Exit 16
Infrastructure
Results
$4,300,000 est. value
NY

2022 Saratoga County Paving Projects
Infrastructure
Post-Bid
$300,000 est. value
Ballston Spa, NY

Reported 07/20/2022 12:00 AM
Project Title

Moe Road Multi-Use Path

Physical Address View project details and contacts
City, State (County) Clifton Park, NY 12065   (Saratoga County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value $13,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes construction of a multi-use path beginning at the intersection of Moe Road and Sugarbush Road at the existing crosswalk. The path travels south along the west side of Moe Road to the intersection with Crescent Road, the path then turns east along the southside of Crescent Road. The path terminates at the existing crosswalk at Okte Elementary School.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents