Similar Projects
Wastewater Treatment Plant and Associated Appurtenances
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Mid-County Waste Water Treatment Plant Headworks
New Construction
Bidding
$5,000,000 est. value
Dunedin, FL 34698

Meadowlake Water Treatment Plant Expansion
Bidding
Less than $1,686,000 est. value
Green Cove Springs, FL 32043

Design Build Services Cosme WTP Operational and SCADA Improvements
Post-Bid
$30,000,000 est. value
Saint Petersburg, FL 33731

J046--Fy20: RFI Water Treatment Boiler and Chiller
Post-Bid
Tampa, FL 33612

Tindall Hammock Irrigation and Soil Conservation District Water Treatment Plant Improvements Phase 2
Term Contract
Results
Less than $572,000 est. value
Davie, FL 33314

HFC AWTP Master Plan Improvements, Phase I Design-Build
Results
Less than $254,000,000 est. value
Tampa, FL 33602

CR 136 / I-75 Water Treatment Plant
Construction
FL

Wastewater Treatment Plant No. 2 Expansion
Addition
Design
Palm Coast, FL

Potable Water Treatment Plant Operations Services
New Construction, Term Contract
Bidding
Jupiter, FL 33478

District 2 Water Reclamation Facility South Headworks Rehabilitation
Post-Bid
Jacksonville, FL 32218

Surface Aerator Assembly and Placement
Results
West Palm Beach, FL 33417

Southern Region Water Reclamation Facility Process Improvements
Renovation, Addition
Design
$17,500,000 to $22,500,000 est. value
Boynton Beach, FL 33437

Spencer's Crossing Water Treatment Facility (WWTF) Clarifier No. 1 Foundation Stabilization
Renovation
Bidding
Orange Park, FL 32065

Reported 10/13/2021 12:00 AM
Project Title

Spring Lake Improvement District WTP Two Improvements Cas Project

Physical Address View project details and contacts
City, State (County) Sebring, FL   (Highlands County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

To include all labor, material, equipment and incidentals required for the installation of the Spring Lake Improvement District Water treatment Plant Number Two consisting of one concrete electrical – chemical building, rehabilitate existing 400,000 gallon Crom water storage tank, installation of four high service pumps w/ VFD’s, a 250 KW generator with ATS, rehabilitate existing 60 hp turbine well pump & motor, civil site work, and the installation of 1,353 feet 10-inch PVC water main

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents