Similar Projects
Z--BIE/Nmns/Fm/Install New TPO Roofing Exs
Term Contract
Design
Fort Wingate, NM

70160 GSA Roof Replacement
Alteration
Bidding
$250,000 to $500,000 est. value
Albuquerque, NM 87102

Marshall Infirmary and Stables Low-Slope Roof Area Re-Roof
Alteration
Bidding
$400,000 est. value
Roswell, NM

Roof Renovation Project
Post-Bid
NM 87034

Roofing Contractor on Demand
Infrastructure
Post-Bid
Less than $1,000,000 est. value
Rio Rancho, NM

Town Hall and Fire Station Roof Replacement
Results
Springer, NM 87747

Campus Wide Roof Repair
Results
Silver City, NM 88062

Shiprock Classroom Building Roof Renovation Project, Crownpoint Center Building Roof Renovation Project, Shiprock North Campus Gymnasium HVAC
Alteration
Bidding
$600,000 est. value
Shiprock, NM 88310

Sunrise Elementary School Partial Re-Roof - 2021
Alteration
Post-Bid
$475,000 est. value
Chaparral, NM 88081

Roofing IDIQ- Plains Area - South
Results
$2,000 to $3,000,000 est. value

Water Tank No. 5 Rehabilitation Phase II Roof Replacement
Alteration
Post-Bid
Belen, NM 87002

DACC Alex Sanchez Roof Coatings
Results
Las Cruces, NM 88003

Albuquerque Convention Center East Building Reroofing
Alteration
Post-Bid
Albuquerque, NM

4070 DACC East Mesa Main Building PVC Overlay
Results
$250,000 to $300,000 est. value
Las Cruces, NM 88011

Installing, Upgrading, and Maintaining all Roofs at Shiprock Associated Schools
Alteration
Post-Bid
Shiprock, NM 87420

Last Updated 06/03/2022 06:15 PM
Project Title

Job Order Contract - Roofing

Physical Address View project details and contacts
City, State (County) Clovis, NM   (Curry County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CMS incorporates approximately 1,600,000 sq. ft. in approximately 24 locations and over 60 portable buildings located throughout the Clovis NM vicinity. It is projected that approximately 8,600 students will be attending 1 High School; 1 Freshman Academy, 1 iAcademy, 3 Middle Schools, 11 Elementary Schools, and 1 Pre-schools. Schools are opened to students during an August through May time period that includes a two-week break period during the month of December and a oneweek break period during the springtime. All administrative, maintenance and supply functions operate throughout the year.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents